
1
ATTACK s.r.o.
Vrútky
5.
Set the boiler output by the request of heated place.
2
Contents:
Technical manual
3Introduction
3General description
4Purpose of use
4Conditions of installation
5Conditions of service
5Technical description
6Control front board of the boiler
7Outside dimensions of the boiler
8The main partsof the NST boiler
9The main partsof the NSK boiler
10 Connecting the boiler to water, gas, electricity
10 Supervision over operation
11 Waste-gas exhaust
11 Spare parts
11 Guarantee, reclamation
12 Service
12 Maintenance
12 Wrapping, transport, storing
12 Accessories,documentation
13 Technical parameters
14 Installation,positioning andhanging of the boiler
15 Connecting the boiler to theheating system,to the hot waterpipeline, gas
pipe-line andpower net
17 Integrated system of boiler control
18 Operation, hot-water mode,heating mode, handling the pump and
circulation, antiblocking capacity of the pump
19 Anti-freezingcapacity, handling the ventilator and control of the air
circulation, service testing functions, signalling of operational conditions
20 Bertelli automatics functions
21 Technical data
22 Resistance and temperaturedependence chart
23 Ignition andionization unit
24 Technical data of ignition and ionization unit
25 Defects of ignition unit
26 The chart of NST connecting
27 The chart of NSK connecting, pump characteristics
28 Setting minimum and maximum output
29 Notes
30 Record on putting the boiler into operation and obligatory service inspections
Putting the boiler into operation
Before first putting into operation it is necessary to take following steps:
Procedure of the first boiler burning:
:
The boiler must be put into operation by a service worker trained by producer!
Check whether the heating system is filled with water and the boiler is deareated properly.
Make sure if all the valves are open.
Open the gas valve next to the boiler and test the sealing of the gas piping in the boiler
Plug the feeding flex into the 230V/50 Hz socket.
Test the socket with another appliance. The main switch of the boiler must be in the off
position.
The button for setting the heating temperature and a room thermostat (if
set to maximum.
Put the mode switch to the position
.
Check the proper operation of all the thermostats and control elements
The boiler is set by the producer to natural gas G20, inlet gas pressure 2,0 kPa.
Before installation and putting the boiler into operation it is necessary to get
acquainted with the instruction for use.
The NSK boiler is equipped with a waste-gas thermostat (B 11 Bs)
1.
2.
3.
1.
2.
3.
winter
4.
connected)
ATTACK NST, NSK - WALL GAS BOILER
Summary of Contents for Attack NSK
Page 1: ......