Page 7 of 9
7
Clean the two (17mm x 45mm) hex-head bolts with alcohol, install the flat washers and apply a dab
of Loctite 242 to the threads. Insert the bolts/washers into each end of the lead screw. Tighten finger
tight. Torque the front lead screw hex head bolt to 156 inch-lbs. using the 17mm socket. Then tighten
the front lead screw clamping screws to 88 inch-lbs. of torque using a 5mm Allen wrench. Loosen the
rear clamping screws, torque the rear lead screw hex bolt to 156 inch-lbs. using the 17mm socket and
retighten the rear lead screw clamping screws to 88 inch-lbs. of torque using a 17mm Allen wrench.
8
Tighten the attaching screws for the lead screw support block/bushing assembly to the tie beam to 88
inch-lbs. of torque using a 5mm Allen wrench. Make sure that the bushing is not contacting the lead
screw.