background image

Press Set  button until  “ Steps” led is on

Adjust  the number of Steps to the desired value using up and down buttons.

Pr e s s  S e t  b u

tton again,  Steps will be stored in the memory and 

“Sequencel”

 

 led will be on.

In case no additional buttons are pressed, the relay will operate automatically within 
10 seconds as programmed 

6-

Sequence

:

Press Set  button until  “ Sequence” led is on

Adjust  Sequence to the desired value using up and down buttons.

Pr e s s  S e t  b u

tton again,  Sequence will be stored in the memory and 

“O.V.set”

 

 led will be on.

In case no additional buttons are pressed, the relay will operate automatically within 
10 seconds as programmed 

Relay has 6 different sequence logic.

a)

1.1.1.1.1.... .....1 system,  displayed as 1.1.1. 

b)

1.2.2.2.2...........2 system, displayed as 1.2.2. 

c)

1.2.3.3.3...........3 system, displayed as 1.2.3. 

d)

1.2.4.4.4...........4 system, displayed as 1.2.4. 

e)

1.2.3.6.6...........6 system, displayed as 1.2.6.                                               

f)

  f)1.2.4.8.8............8 system, displayed as  1.2.8.   

7-O

.V. Set

:  (Over voltage setting):

Press Set  button until  “ O.V.set” led is on.

Adjust  O.V.set to the desired value using up and down buttons.

Pr e s s  S e t  bu

tton again,  O.V.set will be stored in the memory and 

“Manuel”

 

 led will be on.

In case no additional buttons are pressed, the relay will operate automatically within 
10 seconds as programmed 

O. V. s e t

 is adjustable between 250 and  299 seconds

8-

Manual / Automatic selection

:

set

set

set

set

set

set

Summary of Contents for RQ B Series

Page 1: ...number of steps 6 different sequence logic Reactive Active power ratio is displayed on the screen Under voltage over voltage and compensation failed alarms Easy programming Harmonic free operation Eas...

Page 2: ...0 99 with 0 01 steps 3 Ton re connect delay setting Press Set button until T on led is on Adjust T on to the desired value using up and down buttons Press Set button again T on will be stored in the m...

Page 3: ...ll operate automatically within 10 seconds as programmed Relay has 6 different sequence logic a 1 1 1 1 1 1 system displayed as 1 1 1 b 1 2 2 2 2 2 system displayed as 1 2 2 c 1 2 3 3 3 3 system displ...

Page 4: ...ed is on means the load is inductive Cos led is on displaying the present cos power factor Q P led is on displaying the present ratio of reactive power to active power For example the display reading...

Page 5: ...current transformer from the same phase of the network If the supply voltage and the current transformer are at different phases the polarity adjustment will not operate and the relay will not functi...

Page 6: ...teps are disconnected for no voltage more than 50 msec c k set 0 03 1 15 or automatic c k set Set Cos 0 90 0 99 Sequences 1 1 1 1 1 2 2 2 1 2 3 3 1 2 4 4 1 2 3 6 6 1 2 4 8 8 Contacts Same as number of...

Page 7: ...03 0 06 0 12 0 18 0 25 0 31 0 37 0 5 0 62 0 75 500 5 0 05 0 1 0 15 0 2 0 25 0 3 0 4 0 5 0 6 1 600 5 0 04 0 08 0 12 16 0 2 0 25 0 33 0 41 0 5 0 83 800 5 0 03 0 06 0 09 0 12 0 15 0 18 0 25 0 31 0 37 0...

Page 8: ...Q 1 1 2 B R e a k tiv e P o w e r C o n tro l R e la y set k C 144 70 90 138 138 Panel window with 144 v v v v v v v v v v v v GEPA K o m p a n z a s y o n c H e d e f c o s T K a d s a y s S ra la m...

Page 9: ...T K a d s a y s S ra la m a A G a y a r M a n u e l o n T o ff N o rm a l C C a p In d 1 2 3 4 5 6 7 8 9 10 11 12 Q P c o s R Q 1 1 2B R e a c tiv e P o w e r C o n tro l R e la y set k C R Q B S E R...

Reviews: