![GeoVision GV-NVRH V5 User Manual Download Page 25](http://html1.mh-extra.com/html/geovision/gv-nvrh-v5/gv-nvrh-v5_user-manual_2215813025.webp)
20
3.2
Turning on the Power
Once the above hardware is properly connected, it is the time to turn on the GV-Hot Swap
Surveillance System V5. To turn on the power, follow these steps:
1. Turn on the monitor.
Power On
Figure 3-3
2. For 4U (20 bay) models, turn on the AC power switch on the rear panel first.
4U (20-Bay) Models
Figure 3-4
3. Turn on the main power switch on the front panel.
Figure 3-5