3. Connect the DB9 port of EEPROM BOARD to the RECEIVING
MASTER. Turn on the power to the RECEIVING MASTER. Menu 10
will be displayed, and be ready for setting.
4. Disconnect the power supply of the RECEIVING MASTER when
parameter entry is finished and checked as correct. Pull out the
EEPROM and insert it back in its socket on the DIALING UNIT.