MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM
| NETWORK INSTALLATION |
11
3.2.2 POWER THE SUPERVISOR
■
Cellular Gateway Supervisors:
Move the battery switch to the
9-24V
setting or to
BATTERY
, according to the
chart below. Connect to external DC power, then proceed to Section 3.2.3.
For solar panel information, see Appendix F.
6:
TABLE 6:
Cellular Gateway Supervisor Battery Switch Options
12:
FIGURE 12:
Cellular Gateway Supervisor Battery Switch
13:
FIGURE 13:
Non-Cellular Supervisor Battery Switch
■
Non-cellular Supervisors:
Move the battery select switch to either the
ALKALINE
or
LITHIUM
position
depending on the type of battery being used.
Align the positive (
+
) side of the batteries with the
+
indicator in the battery
holder. Push the batteries straight down into the holder.
14:
FIGURE 14:
Battery Detail
Power Source
Air Temp Less Than 0 °C
Air Temp Greater Than 0 °C
Domestic / Mains
9-24V
BATTERY
Solar with external battery
9-24V
N/A
Solar without external battery
N/A
BATTERY
Summary of Contents for GeoNet 8900 Series
Page 2: ......
Page 4: ......
Page 12: ...VIII ...
Page 38: ...26 MODEL 8800 2 4B ADD ON MODULE GEOKON ...
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......