![Geobrugg GBE-500A-R Maintenance Manual Download Page 30](http://html.mh-extra.com/html/geobrugg/gbe-500a-r/gbe-500a-r_maintenance-manual_2214452030.webp)
Page 30/32
© Geobrugg Gruppe, CH-8590 Romanshorn, Switzerland
Maintenance manual RXE, GBE / 09
9
FINAL CHECK
After servicing has been completed, above all the following points must be checked:
a)
Are the support ropes and arrestor cables, as well as the lateral bracing, joined to the correct anchors?
b)
Are the rope guides at the foot and head of the post laid out correctly?
c)
Has the correct number of mesh loops or rings been left free to the left and right of the posts?
d)
Is the net fitted correctly to the support ropes or U-Ropes?
e)
If support ropes have been separated, are the bottom support ropes joined to the corresponding anchor and
not to the base plate?
f)
Is the number of wire rope clips on the rope end connections correct?
g)
Are the wire rope clips fitted correctly?
h)
Has the correct tightening torque been applied to the wire rope clips?
i)
Have the nets been connected to one another correctly?
j)
Have the border nets been fastened to the vertical ropes correctly?
k)
Is the slack of the top support rope less than 3% of the post spacing?