Page 44/48
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-100A-R / 08
14
FINAL CHECKS
First and foremost, the following points must be checked upon completion of the installation:
a)
Are the support ropes and the lateral anchor ropes routed to the correct anchors?
b)
Are the ropes correctly routed at the bottom and top of the posts?
c)
Are the heads of the shackle bolts of the bottom shackle pointing upslope? (PICTURE)
d)
Have the correct number of diamonds been left free on the right and left of the posts?
e)
Is the mesh correctly attached to the support ropes?
f)
Is the number of wire rope Clips s on the rope connections correct?
g)
Are the wire rope clips correctly attached?
h)
Have the wire rope clips been lubricated and has the correct torque been applied?
i)
Are the mesh panels connected correctly to one another?
j)
Have the mesh panels been correctly attached to the border posts?
k)
Is the sag of the upper support rope less than 3% of the post distance?
Summary of Contents for GBE-100A-R
Page 2: ...Page 2 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 3: ...Page 3 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 45: ...Page 45 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 46: ...Page 46 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...
Page 47: ...Page 47 48 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 100A R 08...