3. INSTALLATION

3.1 Water connection

During installation, regard must be paid to the dimensions of 

the pipes with respect to the pre-existing water pressure and 

the pressure loss in order to ensure sufficient pressure and 

water flow rates at the draw-off point.

The maximum working pressure is 10 bars, and the maximum 

operating  temperature  is  65°C.  If  necessary,  the  supply 

pipe must be equipped with a pressure reduction valve and 

possibly a filter.

As  for  all  pressure  vessels,  the  Vanvex  RS’s  connections 

must  also  be  equipped  with  an  approved  safety  valve  on 

the service side and an approved check valve on the supply 

side.

All pipe work must comply with water safety regulations. 

3.2 Placement of pipe    

 

 

connections

Hot water outlet is mounted on the upper 

connecting branch. (¾” RG)

If  the  unit  is  used  with  the  circulation 

of  the  hot  water  supply,  the  middle 

connecting  branch  is  used  as  a  return 

path. (¾” RG)

Inlet of fresh cold water is mounted on 

the bottom connecting branch. (¾” RG)

It is recommended to use 3/4“ 

flextube for the connection of the 

Waterconnection,  to  avoid  possible 

sound from the vibration.

No holes for fittings or the like may be drilled in 

the product!

Such would be able to damage the functionality 

of the product and cause the product to have to 

be scrapped!

3.3 Connection of condensation drain

While the Vanvex RS is running, some 

condensation  water  will  occur,  which 

is  conducted  to  the  drain  connecting 

branch 3/4” (1). 

The  quantity  of  condensation  water  

depends  upon  the  humidity  of  the  air 

going through the inlet to the Vanvex RS. 

The  condensation  connecting  branch 

must be equipped with a hose with a air 

tight water trap, and run to a drain. The 

water trap must contain a water column 

of at least 60 mm.

 

 

 

It is also possible to use other tight  

 

 

 

air traps, like a tube with one turn.

If mounting of the water trap is omitted, water 

damage or damage to the Vanvex RS can arise! 

If the water trap is not correctly mounted, the 

warranty will not apply!

3.4 Air intake and exhaust

Make sure that there is sufficient space around the Vanvex 

RS.

Inlet air

The inlet air may not be polluted with aggressive 

components! (Ammonia, sulphur, chlorine etc.)

Parts in the system may be damaged.

Air connections

Inlet and outlet ducts must be made of smooth pipes 

to minimize pressure losses. Consider the fan working 

pressure and the duct resistanc (See technical data).

It is advised to install the air ducts that are placed near the 

heating pump, levelled or with a light fall towards the extract 

air outlet to avoid leaking of condensed water. This will 

avoid leaking of condensed water from the ducts.

When air ducts are placed outside the building the back 

pressure valve (with a small resistance) should be placed to 

ensure no cold air is entering the room in the winter time if 

the heating pump is standing still.

The heat pump may only be used with the boiler 

filled up!

The unit must always be disconnected from the 

power before the front panel is removed. When 

the unit is disconnected from the power, please 

wait until the fan has stopped before opening the 

front panel!

It is advised to insulate all ducts to lower heat loss and to 

lower the noise level.

3.5 Connection of heat exchanger

In the heat boiler the can be a heat exchanger of 0,95 m² 

installed, which is enamelled outside. The connection is 

in ¾” RG. In the sensor pipe for the thermostat sensor 

there can also be placed a sensor to control the external 

connection fx wood burner etc. The sensor can max. have a 

diameter on 6 mm.

 

Installation Manual

1

60 mm

Sun col-

lector In

Sun 

collec-

tor Out

Summary of Contents for Vanvex R OPTIMA 155

Page 1: ...Installation Manual Vanvex RS Domestic hot water heat pump Version V1 1008 GB...

Page 2: ...it safety instructions 8 2 2 Delivery 8 2 3 Storage 8 2 4 Transport 8 2 4 1 Transport with forklift 8 2 4 2 Unloading the heat pump 8 2 4 3 Transport with trolley 8 2 5 Placement set up 8 2 6 Connecti...

Page 3: ...emperature with the heat pump on C 55 Max water temperature with operation of heat pump and electrical heating element C 65 Domestic water boiler Material Steel specially enamelled Net volume Litre 28...

Page 4: ...nt overview No Description 1 Compressor 2 Condenser 3 Vaporiser 4 Centrifugal fan 5 Expansion valve 6 Drying filter 7 Pressure switc 8 Magnitic valve 9 One way valve Component overview Sensor Temperat...

Page 5: ...the heat pump have to have a safty valve and an automatic nonreturn valve The installation of the cold water connection shall be at the back of the unit 3 4 RG The max pressure is 10 bar and the max t...

Page 6: ...2 Reducing valve 3 Test valve 4 Contra valve 5 Manometer adapter 6 Circulation pump 7 Screwed connection with coupling 8 RG Connecting of cold water according to DIN 1988 Safety valve p 6 bar to be mo...

Page 7: ...PE MA4 T8 T7 T6 T5 PE N 13 12 11PE 10N 9F 8 6 5 4 3 2 1 X1 X3 X2 T1 6AH ICD 852xxx155 PC COM PE L PE Brun brown braun Bl blue blau Brun brown braun Sort black schwarz Brun brown braun Bl blue blau Gu...

Page 8: ...the safety equipment for the water circuit 2 3 Storage The Vanvex RS must be stored upright without water and in its packaging 2 4 Transport The Vanvex RS can not be tilted up to more than 45 C If thi...

Page 9: ...be equipped with a pressure reduction valve and eventually a filter When installing the pipe work in the house any dirt in the pipes must be avoided Eventually flush the pipes with clean water before...

Page 10: ...ood beneath 5 Carry on with removal c Remove the lower part of the palette while keeping the product in an angle position still with 2 pcs wood be neath 6 Product on floor with 2 pcs of wood 7 Removal...

Page 11: ...ain The water trap must contain a water column of at least 60 mm It is also possible to use other tight air traps like a tube with one turn If mounting of the water trap is omitted water damage or dam...

Page 12: ...fer to user manual 5 Fault finding The domestic hot water heat pump is equipped with followring safety devices 5 1 High pressure switch To prevent the compressor exceeding its range of application the...

Page 13: ...The right to make changs is reserved 13 6 Service Maintenance For maintenance refer to the operating instructions...

Page 14: ...The right to make changs is reserved 14 Note...

Page 15: ...The right to make changs is reserved 15...

Page 16: ...erslev Tel 45 73 53 27 00 Fax 45 73 53 27 07 E Mail salg genvex dk Germany Novelan GmbH D 95359 Kasendorf Tel 49 0 92 28 99 60 7 0 Fax 49 0 92 28 99 60 7 189 E Mail info novelan de Great Britain Total...

Reviews: