5. INSTALLATION OF THE AUTOMATED SYSTEM

5.1.

PRELIMINARY CHECKS

To ensure safety and an efficient automated system make

sure the gate structure complies with the following

requirements:

max. single leaf length up to 2.5 metres (with V and VR

operator versions);

max. single leaf length up to 4 metres (with L and LR

operator versions);

sturdy and rigid leaf structure;

proper and uniform movement of the leaves, without

any irregular friction during their entire travel;

good condition of existing hinges;

presence of mechanical stop limits.

presence of the electric lock for the reversing version.

presence of an efficient earthing for the electric

connection of the operator.

We advise you to carry out any metalwork jobs before

installing the automated system.
The condition of the structure directly affects the reliability

and safety of the automated system.

5.2.

INSTALLATION OF THE OPERATORS

1) Secure the rear bracket on the pillar according to the

instructions of 

Dwg. A

.

 

If necessary, change the length

of the supplied bracket. Any securing errors may be

remedied thanks to 4  securing holes on the rear bracket.

Caution

: observe the indicated dimensions in order not

to endanger the operator efficiency.
In case of iron pillar, carefully weld the bracket directly

on the pillar (Fig. 4).

In case of masonry pillar, use the optional plate for a

securing to wall or to be bolted (Fig. 4). Then carefully

weld the bracket on the plate.

GENERAL RULES TO DETERMINE

THE INSTALLATION DIMENSIONS

If the dimensions indicated in table A  cannot be realized,

the following must be taken into consideration in order to

determine different measures:

-

to get 

90° leaf opening: a + b = c

-

to get 

leaf opening over 90°: a + b < c

-

lower a and b dimensions determine higher speed

.

Current standards have to be complied with.

-

limit the difference of the dimensions a and b within

4 cm

: higher differences cause high speed variations

during the opening and closing movement.

-

due to the operator overall dimensions, the min. 

  Z

dimension is 45 mm 

(Fig. A).

If the pillar dimensions or the hinge position make it

impossible to keep the dimensions 

a

 within the

desired measure, a niche on the pillar is to be

executed as shown in Fig. B.

Table

 

A: Recommended dimensions ( in mm.)

Model

E-volution

L-V-LR-VR

A

B

C (¹)

D (²)

Z (³)

L

α

αα

αα

90°

110°

125

290
290

75
60

60
60

1200
1200

145

145
125

Dwg. A

INSTALLATION DIMENSIONS

(¹) stem useful travel      (²) max. dimension        (³) min. dimension