First Edition • Seventh Printing
Operator's Manual
Operating
Instructions
Part No. 160567
ZX-135/70 57
Pipe Cradle Instructions
The pipe cradle assembly consists of 2 pipe
cradles positioned at either side of the platform
and mounted to the guardrails with U-bolts.
a
strap
b
U-bolts
c
pipe cradle mount
d
upper platform railing
e
pipe cradle weldment
f
middle platform railing
g
flat washers
h
nylock nuts
Observe and Obey:
Pipe cradles must be installed on the inside of
the platform.
Pipe cradles must not obstruct the platform
controls or the platform entrance.
The bottom of the pipe cradle tube must rest
on the platform floor.
Be sure the platform is level before installing a
pipe cradle.
Pipe Cradle Installation
1
Install a pipe cradle on each side of the
platform. Refer to the illustration on the left.
Make sure the bottom of the pipe cradle tube
rests on the platform floor.
2
Install two U-bolts from the outside of the
platform rails through each pipe cradle mount.
3
Secure each U-bolt with 2 washers and 2 nuts.
Summary of Contents for X-135/70
Page 9: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 7 ...
Page 11: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 9 ...
Page 12: ...Operator s Manual First Edition Seventh Printing General Safety 10 ZX 135 70 Part No 160567 ...
Page 13: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 11 ...