48
z
Install the dowel pins
z
install the new gaskets( and )
z
apply GENERIC bond no. 1215 to the clutch
cover as shown in the illustration.
GENERIC bond no. 1215
NOTE:
Install the kick starter lever as
shown in the illustration.
Tightening toque
:
8-12Nm
(0.8-1.2kg-m, 6.0-8.5Ib-ft)
PISTON
z
install the piston rings on the piston.
The first and the second ring: keystone ring.
NOTE
:
Position the ring so that the marking is on
upside.
z
it is extremely important that, when the
piston is fed into the cylinder, each ring in
place should be so positioned as to hug
the locating pin as shown in illustration.
Summary of Contents for XOR 50 ccm
Page 1: ......
Page 19: ...19 14...
Page 52: ...52 CHAPTER 4 FUEL AND LUBRICATION SYSTEM CONTENTS FUEL SWITCH CARBURETOR OIL PUMP...
Page 73: ...73 3 Disconnect throttle cable and oil pump cable 4 Remove rear brake cable adjusting nut...
Page 86: ...86...
Page 101: ...101 WIRE CABLE AND BRAKE HOSE ROUTING...
Page 102: ...102 carburetor...
Page 103: ...103...
Page 104: ...104 Ignition coil Starting relay CDI HORN POWER SWITCHH...
Page 106: ...106...