background image

2

Model GF-3200DMM & GF-4200DMM Humidifier Installation Manual

INSTALLATION

RETURN INSTALLATION:  

Cut a rectangular hole using the 

manufacturer-supplied template and a second 6” round hole; 10” to 

15” from side of the humidifier, near the cabinet horizontal centerline.

SUPPLY INSTALLATION:  

Cut a 

rectangular

 hole using the 

manufacturer-supplied template and a second 6” round 

hole; 10” to 15” from side of the humidifier, near the cabinet 

horizontal centerline.

3

Install the by-pass pipe assy to the humidifier by-pass 
panel and the furnace plenum. 

6"

Round

10 - 15"

9.13"

Wide

3200 & 4200

12"

High

4200

9.13"

High

3200

1

1

OR

6"

Round

10 - 15"

9.13"

Wide

3200 & 4200

12"

High

4200

9.13"

High

3200

Return

Return

Supply

Supply

BYPASS PIPE ASSEMBLY

Preparing The Solenoid Valve Mounting Bracket For Left To Right Side Installation On 3200 / 4200 Humidifiers 

                     

1.

 Loosen nut on top of solenoid (DO NOT REMOVE)   

 2.

 Rotate mounting bracket 180° as shown    

3.

 Re-tighten nut

4

Install the by-pass pipe assy to the humidifier bypass 

panel and the furnace plenum. 

BYPASS PIPE ASSEMBLY

3.

2.

Rotate For Installation on the 

RIGHT

 Side of Humidifier Chassis

Nut

Mounting 

Bracket

1.

Mounting 

Bracket

Nut

Pre-Installed on the 

LEFT

 Side of Humidifier Chassis

Humidifier 

Chassis

Humidifier 

Chassis

Reviews: