General Pump RA2 Quick Start Manual Download Page 3

GENERAL PUMP  

A member of the Interpump Group

RA2

Industrial Unloader

INSTALLATION AND INSTRUCTIONS FOR USE

Ref 300929 Rev. B

05-20

1. GENERAL INFORMATION

1.1 The 

RA2 

automatic unloader is a manually adjustable,

pressure operated device, which, according to its setting, limits

the pumps/system pressure by conveying the excess of water to 

the by-pass. Moreover, when the outlet flow is blocked, this

device totally releases the flow,  and keeps under pressure the 

portion of the system following the valve, while it reduces the 

pressure in the portion of the system preceding the valve

 

1.2 Since the 

RA2

 valve is used in conjunction with a high

pressure water pump/system, which shall be called hereafter

only “system”, installation and use must be suited to the type of

system used and comply with the safety regulations in force in

the country where the valve is used.
1.3 Before using the valve, make sure that the system to valve 

is used with is certified to comply with the relevant directives

and/or regulations.
1.4 Before installing and using the valve for the first time, we

suggest you check that it is undamaged and make sure that the

rated features correspond to the required ones. If this is not the

case, do not use the valve and contact the Customer Service

Department. 
1.5 In order to install the valve correctly, follow the instructions 

for the water inlet, outlet and by-pass connections, as stated in

this manual and/or the valve itself.

2- PACKAGE

2.1- Packages must be handled in compliance with the instruc-

tions stated on the packages themselves and/or provided by the 

manufacturer.

  

2.2- In case the valve is not used immediately, it must be stored 

in its package and placed in areas which are not exposed to 

the weather and protected from excessive humidity and from 

direct sunlight. Moreover, it is advisable to place wooden pallets 

or other types of pallets between the package and the floor, in 

order to prevent the direct contact with the ground.

2.3- The package components must be disposed of in compli-

ance with the relevant laws in force.

3. INSTRUCTIONS FOR PRESSURE SETTING

3.1 In order to obtain a correct adjustment and consequently a 

proper functioning of the valve, always make sure that, when

working at the maximum pressure, the valve by-pass keeps 

releasing a quantity of water equal to 5% of the total flow rate.

In case the flow rate at the by-pass is close to zero or exceeds 

15% of the maximum flow rate, this could cause failure, early 

wear and result in situations of danger.

The positions mentioned in the following instructions refer to

those shown in the parts list on page 2.
3.2 Connect the valve to the water system and follow these

steps:
3.2.1 Loosen the nut (pos. 3).
3.2.2 Unscrew the knob (pos. 1) in order to completely release 

the springs.
2.2.3 Open the gun or the water control device and start the

system. Make sure the air contained in it is fully ejected. 
3.2.4 Keeping the gun or the water control device open, start

adjusting the pressure by screwing down the knob (pos. 1). 

Alternate the adjusting operations with a few openings and

closings of the gun or of the control device. When the desired

pressure has been reached, open and close the gun/control 

device a few times again in order to stabilize the various

components (seals, springs, etc.). Check the pressure valve

again and correct if necessary.
3.2.5 Screw down the lower nut (pos. 3) up to contact with the 

body. Lock the two nuts (pos. 3) by tightening the upper nut to the

lower nut.
3.2.6 In order to obtain working pressures lower than the 

maximum set pressure, unscrew the knob (pos. 1).
In case of doubts, do not hesitate to contact the GP Service 

Department. 

IMPORTANT: During use, never exceed the maximum 

values of pressure, flow-rate and temperature as stat-

ed in this document and/or indicated on the valve.

4. WARNINGS

4.1 The installation and the setting of the maximum pressure  

must be made by qualified staff only, who must have the required 

skills to handle high pressure systems and be informed of the

operating and safety instructions contained in this manual.
4.2 The installer must provide the ultimate consumer with the

proper instructions for the correct use of the system the valve is

used in connection with.
4.3 Use soft and filtered water only. In case of salt water and/or of

water containing solid particles of a size exceeding 360µm, the

internal components of the valve will be subject to quick wear;

furthermore, this might compromise the correct functioning of the

valve. Addition agents can be used in the water, provided that

they are biodegradable and always complying with the  

regulations in force in the country where the valve is used.
4.4- Use  guns  and/or  other  control  devices  ensuring  a 

perfect  seal  when closed.  Leakages  may  compromise the 

correct functioning of the valve.

Summary of Contents for RA2

Page 1: ... through the by pass Protects the system from over pressurization Traps pressure after the valve while reducing pressure at the pump SPECIFICATIONS FEATURES DIMENSIONS Ref 300929 Rev B 03 19 Part Number RA2 Max Pressure 3 050 PSI Max Flow 61 0 PSI Max Temperature 185 F Port Size Inlet 1 BSP F Outlet 3 4 BSP F Bypass 1 1 4 BSP F Weight 10 6 lbs General Pump is a member of the Interpump Group ...

Page 2: ...Ring 22 x 30 x 1 5 LP 1 16 F36339366 Piston Control 1 17 F36339482 Spacer 1 No Part No Description Qty 18 F90261000 Ring Spacer Ø 15 x 23 x 6 LP 1 19 F36339970 Guide Ring 1 20 90386500 O ring 29 82 x 2 62 1 21 F90517750 Anti extrusion Ring 30 9 x 35 x 1 5 1 22 F36340070 Bushing 1 23 701014 O ring 12 42 x 1 78 1 24 F36339566 Ring 1 25 90385200 O ring 22 22 x 2 62 1 26 F90514450 Anti extrusion Ring ...

Page 3: ...of water equal to 5 of the total flow rate In case the flow rate at the by pass is close to zero or exceeds 15 of the maximum flow rate this could cause failure early wear and result in situations of danger The positions mentioned in the following instructions refer to those shown in the parts list on page 2 3 2 Connect the valve to the water system and follow these steps 3 2 1 Loosen the nut pos ...

Page 4: ...e by pass without hose 4 11 Before operating the system it is advisable to start it for a preliminary test run in order to check that the system is properly installed 4 12 In order to optimize the pump valve coupling it is nec essary to keep the valve operation as a function of the pump pressure and flow rate within a maximum power of 81 5 HP As shown in the chart this means using pumps producing ...

Page 5: ...p Group RA2 Industrial Unloader INSTRUCTIONS FOR USE CONT The valve should be mounted on the pressure line in any position horizontal or vertical which will allow easy access to the pressure adjusting screw For proper oper ation the by pass line internal diameter should be at least 1 25 at the narrowest point and should not be connected directly to the pump inlet line see below for correct instal ...