background image

ASSEMBLY

HELPFUL GUIDELINES

STEP 10

Place  the  Net  Pots  with  the  CocoTek  Liners  into  the  growing  sites  and  use  the  Clay 
Pebbles
 to support seedling plants. Always rinse the Clay Pebbles before use and see 
the Helpful Guidelines for planting and cleaning the system. 

FILLING

Before  filling  your  system  with  water  it  is 
essential  that  you  understand  the  system 
capacity.  The  reservoir  should  be  drained 
first before draining the growing chambers. 
This will prevent overfilling of the reservoir 
and  possible  flooding.  See  illustration  for 
reservoir capacities at each of the steps. Fill 
the reservoir with a known volume of water 
and  then  start  the  pump.  Adjust  the  Drain 
Level  Tubes  (DLT)  to  the  desired  level  and 
start  adding  water  in  1  gallon  increments 
until  the  Growing  Chambers  and  reservoir 
are  at  the  desired  levels.  Record  the  total 
gallons  to  be  used  for  calculating  the 
amount of nutrient to add to the system. See 
chart for approximate amount of water each 
system holds at the two operating levels.

CAUTION:  Never  run  the  water  pump 
without water covering the pump inlet.

17

13

10

7

normal operational range (gallons)

AeroFlo

system

Reservoir

capacity

Each Chamber

Total Water*

low level high level low level high level

gallons

AeroFlo

18

13

0.6

2.4

15

20

AeroFlo

30

13

1.0

4.0

16

25

* Total amount of water in all chambers and reservoir

Summary of Contents for AeroFlo2 18

Page 1: ...AeroFlo2 18 30 Assembly Guide...

Page 2: ...Cover 8 SnapStand Support Legs 2ea 9 SnapStand Base 2ea 10 SnapStand Cross Fitting 2 ea 11 SnapStand Cross Support 12 Clay Pebbles 9 L 13 FloraSeries Nutrients 1 Chambers Box 14 Drain Level Tube DLT 1...

Page 3: ...the Reservoir grommet while supporting the grommet from the inside STEP 2 Connect the Pumpline to the Pump leaving the Swivel Fitting to attach to the Manifold STEP 3 Place the Pump assembly into the...

Page 4: ...e two Support Legs into the SnapStand Bases and the Snapstand Cross Fittings Snap the Cross Support into the SnapStand Cross Fittings STEP 6 Lubricate the end of the DLT with the Lubricant provided an...

Page 5: ...of the water in the Growing Chamber is controlled by the height of the DLT Keep the DLT access covered with the DLT Cover STEP 9 Attach each of the Spraylines to the Manifold and then the Flexible Pum...

Page 6: ...steps Fill the reservoir with a known volume of water and then start the pump Adjust the Drain Level Tubes DLT to the desired level and start adding water in 1 gallon increments until the Growing Cha...

Page 7: ...y plants and higher yields Place the AeroFlo2 system in a warm well lit well ventilated location such as an outdoor garden sunlit window patio or greenhouse Keep your AeroFlo2 away from areas where th...

Page 8: ...h the filter and form an oily residue OPERATION When plants are small and their roots are not well developed the Drain Level Tubes DLT should be at the maximum height to allow nutrient rich water to r...

Page 9: ...t resorting to harsh toxic chemicals FloraShield s unique combination of compounds can thoroughly rinse systems and plants during all phases of growth Growers across the globe have attested to FloraSh...

Page 10: ...ficial microbes that activate when introduced to a plant s root structure This metabolic fuel solution is packed with powerful vitamins complex plant sugars protein building amino acids seaweed extrac...

Page 11: ...ectar ensures optimal metabolic rates during flowering and fruiting phase when nitrogen levels have been reduced FloraNectar also promotes a sturdier plant structure during the vegetative phase when h...

Page 12: ...n the plug matrix results in early root growth Use Rapid Rooter for robust early rooting that supports explosive plant growth Rapid Rooter plugs are available in the following sizes 50 plug tray 50 pl...

Reviews: