General Information and Setup
4
Owner’s/Installation Manual for SMM
SMM and Carton Contents
Priority Dial (A)
—Sets module priority.
NOTE: PRIORITY MUST BE DIFFERENT for each
module in an installation.
Priority sets the order in
which loads recover from a load shed event. Recovery
time from a load shed event is five minutes for Priority 1.
Each priority after Priority 1 waits an additional 15 sec-
onds after the initial recovery time. See
Lockout Switch (B)
—Enables or disables lockout func-
tion. Switch positions are LOCKOUT LOAD ON GENER-
ATOR (enabled) and LOCKOUT DISABLED. See
NOTE:
Recovery time is based on priority dial settings.
See
Test Button (C)
—Disables contactor output for a speci-
fied time.
LED (D)
—Provides module status. See
Contactor (E)—
Normally OPEN. If generator begins to
overload, the contactor opens to take load off generator
power. See
.
Mounting Holes (F)
—Internal enclosure mounting holes
provide clean and sturdy mounting.
Directional Arrows (G)—
Provided for mounting pur-
poses.
Priority Decal (H)
—Provided for recording priority of
each module in installation. Install on electrical panel.
Figure 2-1. SMM Features and Controls
A
B
C
D
E
F
F
H
009380
G