
INSTALLATION
- 6 -
- Hold the cables (3) on the other low voltage
wires using the two fretting collars (6),
- Run the QAA 53 room sensor cable into one
of the cable runs on the boiler body (the ca-
ble run cutout must be adapted to the diam-
eter of the cable used),,
- Connect the 2-pin connector (4) to the
QAA 73 room sensor cable then connect it to
the QAA terminal on the control panel,
- Secure the QAA 73 room sensor cable to the
control panel using the cable stiffener (5),
6
3
Z
E
M-
49-0
4
Z
E
M
-50-0
5
Z
E
M-
51-0