- 22 -
V - COMMISSIONING
1 - FILLING THE INSTALLATION WITH WATER
- Filling the installation:
• before you fill, rinse the installation's pipes,
except for the tank.
Refer to the boiler's manual
- Filling the tank:
• fill the domestic hot water production system
using the installation's safety control box (8,
fig. 9 - page 19 - chapter IV - INSTALLATION)
taking care to open a hot water tap.
• After the system is full, check that the tank's
access flap is tightly shut.
- Drain the tank and the installation thoroughly
before filling.
2 - VERIFICATIONS PRIOR TO COMMISSIONING
- Check that the tank access flap is tight and
waterproof (8, fig. 2 - page 8 - chapter III -
TECHNICAL SPECIFICATIONS,
- Check the waterproofing of the various seals and
connectors in the installation,
- Check that the primary circuit is drained,
- Check that the electrical connection is correct.
- To guarantee the stated performances, check
that the security control box's cold water tap is set
to obtain a maximum flow rate for the hot water of
the value indicated in section 1 - page 6 -
chapter III - TECHNICAL SPECIFICATIONS).
3 - USER INFORMATION
The installer must train the user in how the
appliance works. In particular, the user must be
informed of the role and operation of the safety
mechanisms and the need to have the appliance
maintained regularly by a qualified professional.
WARNING TO THE USER
Do not remove or adjust any component part of
unvented water heater :contact the installer.
If this unvented water heater develops a fault, such
as flow of hot water from the discharge pipe, switch
the heater off and contact the installer.