Rev. 00 04/19
OptiFlex Pro Base Kit
Operation
29
Setting the fluidization
The fluidization can be adjusted on the manual units type B, Q, F, L and
S.
The powder fluidization depends on the powder type, the air humidity and
the ambient temperature. Fluidizing and vibration start by switching on the
control unit.
Procedure:
1.
Configure AirMover by opening the ball valve complete and adjusting
with the flow control valve (equipment type F only)
2.
Open the powder container cover (equipment type F only)
3.
Press the
key
The second display level will be shown
4.
Adjust the fluidizing air with the keys
T5/T6
– If in this display level is no operation for 3 seconds, the device
switches back to the first display level
– The powder should only be touched gently, but should be
"cooked" regularly and is also to be stirred using a rod
5.
Close again the cover
Summary of Contents for OptiFlex Pro Base Kit
Page 12: ...Rev 00 04 19 12 Safety OptiFlex Pro Base Kit ...
Page 20: ...Rev 00 04 19 20 OptiFlex Pro Base Kit OptiFlex Pro Base Kit ...
Page 34: ...Rev 00 04 19 34 Operation OptiFlex Pro Base Kit ...
Page 36: ...Rev 00 04 19 36 Decommissioning Storage OptiFlex Pro Base Kit ...
Page 50: ...Rev 00 04 19 50 Fault clearance OptiFlex Pro Base Kit ...
Page 54: ...Rev 00 04 19 54 OptiSelect Pro GM04 OptiFlex Pro Base Kit ...
Page 62: ...Rev 00 04 19 62 Maintenance Repairs OptiFlex Pro Base Kit ...
Page 64: ...Rev 00 04 19 64 Fault clearance OptiFlex Pro Base Kit ...
Page 73: ...Rev 00 04 19 OptiFlex Pro Base Kit Spare parts list 73 Inside back plate fig 21 OptiStar CG21 ...
Page 75: ...Rev 00 04 19 OptiFlex Pro Base Kit Spare parts list 75 Connecting material fig 22 ...
Page 86: ...Rev 00 04 19 86 Spare parts list OptiFlex Pro Base Kit OptiFlow IG07 spare parts fig 26 ...
Page 88: ...Rev 00 ...