Rev. 00 04/19
OptiFlex Pro Base Kit
Decommissioning / Storage
35
Decommissioning / Storage
Decommissioning
1.
End the coating procedure
2.
Switch off the control unit
The adjustments for high voltage, powder output volume and
electrode rinsing air remain stored.
If in disuse for several days
1.
Separate from power mains
2.
Clean guns, injectors and powder hoses (see therefore the
corresponding user manuals)
3.
Turn off the compressed air main supply
Summary of Contents for OptiFlex Pro Base Kit
Page 12: ...Rev 00 04 19 12 Safety OptiFlex Pro Base Kit ...
Page 20: ...Rev 00 04 19 20 OptiFlex Pro Base Kit OptiFlex Pro Base Kit ...
Page 34: ...Rev 00 04 19 34 Operation OptiFlex Pro Base Kit ...
Page 36: ...Rev 00 04 19 36 Decommissioning Storage OptiFlex Pro Base Kit ...
Page 50: ...Rev 00 04 19 50 Fault clearance OptiFlex Pro Base Kit ...
Page 54: ...Rev 00 04 19 54 OptiSelect Pro GM04 OptiFlex Pro Base Kit ...
Page 62: ...Rev 00 04 19 62 Maintenance Repairs OptiFlex Pro Base Kit ...
Page 64: ...Rev 00 04 19 64 Fault clearance OptiFlex Pro Base Kit ...
Page 73: ...Rev 00 04 19 OptiFlex Pro Base Kit Spare parts list 73 Inside back plate fig 21 OptiStar CG21 ...
Page 75: ...Rev 00 04 19 OptiFlex Pro Base Kit Spare parts list 75 Connecting material fig 22 ...
Page 86: ...Rev 00 04 19 86 Spare parts list OptiFlex Pro Base Kit OptiFlow IG07 spare parts fig 26 ...
Page 88: ...Rev 00 ...