
V
04/17
OptiCenter OC04
General safety regulations
•
7
Installation
The services and facilities to be provided by the customer should be in-
stalled according to local regulations.
Grounding
Check the grounding of the booth and the powder management center
before every start-up. The grounding connection is customer specific and
is fitted on the booth base, on the cyclone and on the powder manage-
ment center. Also make sure that the workpieces, and all other systems
are properly grounded.
Operating the equipment
In order to be able to operate the equipment safely, it is necessary to be
familiar with the safety regulations, the operational characteristics and
functioning of the various plant units.
For this purpose, read the safety notes, this operating manual and the
operating instructions of the plant control unit, before starting up the plant.
In addition, all further equipment-specific operating instructions, e.g. the
OptiFlex and all additional components should also be read.
To obtain practice in operating the plant, it is absolutely essential to start
the operation according to the operating instructions. Also, later on, they
serve as a useful aid on possible malfunctions or uncertainty and will
make many enquiries unnecessary. For this reason, the operating manual
must always be available at the equipment.
Should difficulties arise, however, your Gema service center is always
ready to assist.
Inspection
Before switching on the booth, check the following points (where applica-
ble):
−
No foreign material in the central suction unit in the booth and in
the powder suction
−
Sieve machine is connected to the cyclone separator, the clamp
is tightly locked
−
Pneumatic conduction and powder hose are connected to the
dense phase conveyor