
V
04/17
20
•
Start-up
OptiCenter OC04
Grounding of the powder management center
DANGER:
The OptiCenter must be grounded according to the general, local
safety regulations.
►
The grounding of the powder management center must be checked
regularly.
A corresponding connection point at the OptiCenter is reserved for the po-
tential equalization.
Potential equalization – connection point