Commissioning
•
13
Commissioning
Set-up and assembly
Assembly notes
After unpacking and installing the OptiFlex system, the control cabinet is
to be fitted to the floor with the supplied steel bolts. The mounting holes
are located in the Z-profiles on both cabinet sides.
The internal connections have already been made at the factory. The
control unit connections to the external plant parts must be done at the
start-up.
The connection possibilities for the individual control units are found in
the corresponding operating manuals.
When connecting, pay attention particularly to the length and the radii of
the pneumatics hoses!
Set-up and assembly
Compressed air
input
Main valve
Terminal block
recommended