P a g e
|
26
Réf. : 450100 FR
CHAPTER 3 - Installation and implementation
3.1 – Inspecting the machine
Each machine part must be examined by a competent person prior to
putting into operation, so as to detect any faults.
Inspection shall mainly comprise a visual and a functional part.
The inspection phase shall ensure that the parts are reliable and that they
have not been damaged during transport or storage.
■
Checking the all-welded assemblies
(this check is performed with the
engine stopped
)
Visually check there are no external faults, deformations, surface cracks,
wear signs or corrosion marks.
■
Checking tightening
Check that all the accessible screws and nuts are properly tightened.
■
Checking levels
(this check is performed with the engine stopped)
- Fuel level: check the fuel level and top up if required (be sure to refer
to 1.3 “General safety requirements, part
Using and handling fuel
before doing anything).
- Engine oil level: check the engine oil level using the dipstick and top
up if required. The level must be slightly lower than the maximum
mark on the dipstick, but must never exceed it.
■
Checking the safety equipment
Start the engine (be sure to refer to 4.1 Stopping and starting) and check
proper operation of the safety equipment (engine remote stopping).
■
Checking operation
Check the operation of the control devices. Check that the wheel
raising/lowering flywheel and the tilt control function properly, i.e. that
when they are operated, device movement is as smooth as possible with no
sticking points.
■
Checking the wheel and its fastening
Visually check the condition of the wheel and its holder. Check that the
wheel is retracted into its protective cap.
■
Checking the protective cap
Check there are no impacts or cracks on the protective cap.
If an anomaly is detected during this inspection phase or during use, the machine must be
reworked to conformity by competent personnel or by the manufacturer before it is used again.
Summary of Contents for MP.12
Page 50: ...K K ...
Page 54: ......
Page 56: ......
Page 64: ...37000 QE R 05 19 PTH NEQ NEA noir black rouge red jaune yellow noir black M Feuille 1 2 ...
Page 65: ......
Page 66: ...37717 JZH 37000 QE R 05 19 Feuille 2 2 ...
Page 68: ......
Page 70: ......
Page 72: ......
Page 76: ......
Page 77: ......
Page 78: ......