5 – 3
Handling and transport
The
BRV
can be brought to a jobsite by rail or road. The
BRV
is unloaded and placed on an
empty track using lifting equipment with a lifting capacity greater than 2700 kg. A central lifting
bail
[a]
has been installed on the chassis for this purpose. It is also fitted with 4 tie-down rings
[b]
.
There must be no-one in front of and/or behind the machine while it is being handled. Maintain a
distance of 3 metres on each side of the machine.
- Never lean on the BRV.
- Never push a load with the
BRV
.
- Avoid balancing the
BRV.
During handling and transport, the coupling bar
[5]
must be stored on the supports
[c]
located
on the
BRV
.
a
b
c
5
Summary of Contents for BRV
Page 2: ......
Page 6: ......
Page 17: ...Page 17 Société des Anciens Établissements L GEISMAR Prohibited Reproduction 3 2 Dimensions ...
Page 22: ......
Page 36: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 49: ...Section A Mechanical Components ...
Page 51: ......
Page 53: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 61: ......
Page 63: ......
Page 65: ......
Page 67: ......
Page 69: ......
Page 70: ......
Page 71: ...Section B Hydraulic Components ...
Page 73: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 79: ......
Page 81: ......
Page 83: ......
Page 84: ......
Page 85: ...Optional Components ...
Page 87: ......
Page 89: ......
Page 91: ......
Page 93: ......
Page 94: ......