Page 28
Société des Anciens Établissements L.GEISMAR
– Prohibited Reproduction ©
5 – 5
Starting work at the jobsite
– Run the digger for 15 to 20 mins to improve the fluidity of the hydraulic oil.
– When placing the
BRV
on the track, apply the 2 manual parking brakes
[3]
so it stays in posi-
tion. *Option: Negative brake (see Chapter 7 - Optional equipment)
– Couple the
BRV
and the rail-road digger using the coupling bar
[5]
.
– Place the rail brushes
[4]
in working position. Remove the safety shaft pins
[a]
, pull the brush
out and turn it over. Put the safety shaft pins back in place.
– Start the
BRV
running and leave it running for 5 minutes without moving to allow the hydraulic
oil to flow into the system.
3
5
TRAVEL POSITION
WORKING POSITION
4
a
Summary of Contents for BRV
Page 2: ......
Page 6: ......
Page 17: ...Page 17 Société des Anciens Établissements L GEISMAR Prohibited Reproduction 3 2 Dimensions ...
Page 22: ......
Page 36: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 49: ...Section A Mechanical Components ...
Page 51: ......
Page 53: ......
Page 55: ......
Page 57: ......
Page 59: ......
Page 61: ......
Page 63: ......
Page 65: ......
Page 67: ......
Page 69: ......
Page 70: ......
Page 71: ...Section B Hydraulic Components ...
Page 73: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 79: ......
Page 81: ......
Page 83: ......
Page 84: ......
Page 85: ...Optional Components ...
Page 87: ......
Page 89: ......
Page 91: ......
Page 93: ......
Page 94: ......