Shenzhen GETECH CO.,LTD
GEEETECH
58
the cross section of the shaft.
Screw it tightly
. (screw set is in the hole of the pulley)
Step2. Then screw the motor on A16 plate with 4 M3 x 12 screws .
Watch the
18. Add the belt
Part name
Part ID
Required number
pic
Timing belt
No.39
1
M3 x8mm screw
No.21
1
M3 washer
No.7
1
Step1. Punch a M2.5 hole on one end of the belt (the hole can be as the diameter of
the M2.5 screw to drill instead, leave enough margin )
Step2. Fix the belt on one side of the belt -mount with a M3 x 8 screw and washer.
Step3. Thread the belt around the pulley on the motor and the driving wheel (with
M3x40mm screw we assembled just before).
Summary of Contents for Prusa I3 X
Page 1: ...Building Instructions of Geeetech Prusa I3 X Version 01 22 2016 ...
Page 14: ...Shenzhen GETECH CO LTD GEEETECH 10 ...
Page 16: ...Shenzhen GETECH CO LTD GEEETECH 12 ...
Page 26: ...Shenzhen GETECH CO LTD GEEETECH 22 ...
Page 33: ...Shenzhen GETECH CO LTD GEEETECH 29 ...
Page 38: ...Shenzhen GETECH CO LTD GEEETECH 34 ...
Page 40: ...Shenzhen GETECH CO LTD GEEETECH 36 ...
Page 41: ...Shenzhen GETECH CO LTD GEEETECH 37 Step 3 Mount the endstop ...
Page 44: ...Shenzhen GETECH CO LTD GEEETECH 40 2 Add the top late ...
Page 45: ...Shenzhen GETECH CO LTD GEEETECH 41 3 Add A20 beside the A19 4 Add the bottom late ...
Page 46: ...Shenzhen GETECH CO LTD GEEETECH 42 Step 5 Fix the linear bearing PCS8LUU ...
Page 51: ...Shenzhen GETECH CO LTD GEEETECH 47 ...
Page 54: ...Shenzhen GETECH CO LTD GEEETECH 50 ...
Page 64: ...Shenzhen GETECH CO LTD GEEETECH 60 ...
Page 73: ...Shenzhen GETECH CO LTD GEEETECH 69 ...
Page 90: ...Shenzhen GETECH CO LTD GEEETECH 86 Step9 Connect wires for power input ...