
Safety Instructions
Building the printer will require a certain amount of physical dexterity, common sense
and a thorough understanding of what you are doing. We have provided this detailed
instruction to help you assemble it easily.
However ultimately we cannot be responsible for your health and safety whilst
building or operating the printer, with that in mind be sure you are confident with
what you are doing prior to commencing with building or buying. Read the entire
manual to enable you to make an informed decision.
Building and operating involves electricity, so all necessary precautions should be
taken and adhered to, the printer runs on 12V supplied by a certified power supply, so
you shouldn’t ever have to get involved with anything over 12V but bear in mind
there can still be high currents involved and even at 12V they shouldn’t be taken
lightly.
High temperatures are involved with 3D Printing, the Extrusion nozzle of the hot end
can run about 230°C, the heated bed runs 110°C and the molten plastic extruded will
initially be at around 200°C, so special care and attention should be made when
handling these parts of the printer during operation.
We wouldn’t recommend leaving your printer running unattended, or at least until you
are confident to do so. We cannot be held responsible for any loss, damage, threat,
hurt or other negligent result from either building or using the printer.
Summary of Contents for Prusa I3 X
Page 1: ...Building Instructions of Geeetech Prusa I3 X Version 01 22 2016 ...
Page 14: ...Shenzhen GETECH CO LTD GEEETECH 10 ...
Page 16: ...Shenzhen GETECH CO LTD GEEETECH 12 ...
Page 26: ...Shenzhen GETECH CO LTD GEEETECH 22 ...
Page 33: ...Shenzhen GETECH CO LTD GEEETECH 29 ...
Page 38: ...Shenzhen GETECH CO LTD GEEETECH 34 ...
Page 40: ...Shenzhen GETECH CO LTD GEEETECH 36 ...
Page 41: ...Shenzhen GETECH CO LTD GEEETECH 37 Step 3 Mount the endstop ...
Page 44: ...Shenzhen GETECH CO LTD GEEETECH 40 2 Add the top late ...
Page 45: ...Shenzhen GETECH CO LTD GEEETECH 41 3 Add A20 beside the A19 4 Add the bottom late ...
Page 46: ...Shenzhen GETECH CO LTD GEEETECH 42 Step 5 Fix the linear bearing PCS8LUU ...
Page 51: ...Shenzhen GETECH CO LTD GEEETECH 47 ...
Page 54: ...Shenzhen GETECH CO LTD GEEETECH 50 ...
Page 64: ...Shenzhen GETECH CO LTD GEEETECH 60 ...
Page 73: ...Shenzhen GETECH CO LTD GEEETECH 69 ...
Page 90: ...Shenzhen GETECH CO LTD GEEETECH 86 Step9 Connect wires for power input ...