Operation
GEDA
®
1500 Z/ZP
Operating Manual
70 / 84
BL076 GB Edition 07.2015
Ascent
Press and hold the
UP
button (3).
The load platform only moves whilst
the button
UP
(3) is pressed.
Stopping ascent
Release the
UP
button (3).
Descent
Press the
DOWN
button (4) and keep it
pressed.
The platform only moves while you keep
pressing the
DOWN
button (4).
1 =
EMERGENCY STOP
button
Stopping descent
Release the
DOWN
button (4).
The platform descends and automatically stops above the lower safety
area (about 2 m above the ground).
WARNING
The installation personnel can only continue travel after
ensuring that the path of travel downwards is clear.
Again press and hold the
DOWN
button (4).
The system issues an alarm signal and after about 3 seconds, the
platform starts up and stops at the
DOWN
limit switch.
4
3
1