GEDA
®
1500 Z/ZP
Operation
BL076 GB Edition 07.2015
69 / 84
Operating Manual
4.5
Operation for assembly
For installation, it is only possible to operate from the platform in dead
man's control. The platform only operates for as long as the operating
button is pushed.
The ramp, barrier with unloading ramp and assembly bridge must be
closed and engaged. The assembly guard must be properly hung up.
Turn the main switch (on the switch cabinet of the ground station)
to “
I
” position (ON).
Remove the lock (7) that secures the cover.
Push the sliding panel (6) upwards over the
platform control and secure it again with the
lock (7).
Insert the key (5) into the key switch and
turn to the right (position
1
) to activate the
platform control.
Only the platform control is activated for installation.
The lifting speed of the platform is approx. 12 m/min. or 24 m/min.
respectively.
5
7
6