10
SET-UP
5)
Insert the lower hitch pins through the
hitch blocks and ball ends (
picture 5
);
6)
Secure them by means of the cotter
pins which were previously removed
(
picture 5
);
7)
Connect the tractor top link to the third upper point by removing the pin located
between the two plates, inserting the top link and securing it by means of the cotter
pin. Shift the parking stand in the upper position .
8)
Adjust the top link so that the upper part of the frame is parallel to the ground. Block
all the linking parts by means of the sway chains or arms.
9)
Make sure that the central unit axis (case/bevel gear pair) is parallel to the ground,
thus minimizing the stresses on the power take off and increasing the working life of
the equipment.
After executing all the above mentioned activities,
make sure that all the nuts and bolts are tightened.
Picture 5
Summary of Contents for T230
Page 22: ...19 SPARE PARTS TILLER ASSEMBLY T230 T280 T305...
Page 24: ...21 SPARE PARTS DRIVE ASSEMBLY...
Page 26: ...23 SPARE PARTS GEARBOX ASSEMBLY...
Page 28: ...25 SPARE PARTS ROTORSHAFT ASSEMBLY...
Page 32: ...29 SPARE PARTS MAIN DECK ASSEMBLY...
Page 36: ...33 SPARE PARTS TILLER ASSEMBLY T355...