Initial commissioning
Initial commissioning checklist
2010-9015-017
04-2015
7.4
Spare safety shear bolts
Remove and save the extra safety shear
bolts (4).
4
Shear bolts replacement
Tractor PTO
Part No.
Dimensions
Gr.
Quantity
1⅜''-6 splines
2010-7505-710
⅜''-16NC x 1
8
2
1¾'' - 20 splines 2010-7505-720
⅜''-16NC x 1
2
2
7.5
Initial commissioning checklist
This checklist must be completed by the dealer and the customer to validate that
the product is assembled and/or installed according to the manufacturer's
instructions and that it is safe for use.
Note!
Additional information necessary to complete the checklist can be
found in this instruction manual.