BEFORE YOU BEGIN
Installation
Zoneline Air
Instructions
Conditioners
Read these instructions completely and carefully.
•
IMPORTANT –
Save these
instructions for local inspector’s use.
•
IMPORTANT –
Observe all
governing codes and ordinances.
•
Note to Installer –
Be sure to leave these
instructions with the owner.
•
Note to Owner –
Keep these instructions for
future reference.
•
Proper installation is the responsibility of the
installer.
•
Product failure due to improper installation is not
covered under the Warranty.
Questions?
Visit our Website at:
GEAppliances.com
or
call 800.GE.CARES (800.432.2737).
IMPORTANT ELECTRICAL
SAFETY–READ CAREFULLY
CAUTION:
•
All electrical connections and wiring MUST be
installed by a qualified electrician.
•
Follow the National Electrical Code (NEC) and/or
local codes and ordinances.
•
For personal safety, this Zoneline unit and case
must be properly grounded.
•
Protective devices (fuses or circuit breakers)
acceptable for Zoneline installations are specified
on the nameplate of each unit.
•
Do not use an extension cord with this unit.
•
Aluminum building wiring may present special
problems—consult a qualified electrician.
•
When the unit is not running there is still voltage to
the electrical controls.
•
Disconnect the power to the unit before
servicing by:
1. Removing the power cord (if it has one) from
the wall receptacle.
OR
2. Removing the branch circuit fuses or turning
the circuit breakers off at the panel.
Phillips screwdriver
TOOLS YOU WILL NEED
10
WARNING:
Before beginning the
installation, switch power off at the service panel
and lock the area to prevent power from being
switched on accidentally. When the area cannot
be locked, securely fasten a prominent warning
device, such as a tag, to the service panel.
Adjustable wrench
Saw
Hammer
Tape measure