background image

NOTE: 

Commonwealth of Massachusetts Plumbing

Codes 248CMR shall be adhered to. Saddle valves 
are illegal and use is not permitted in Massachusetts.
Consult with your licensed plumber.

Installation Instructions

7

STEP 1   ALL MODELS (continued)

To move the refrigerator indoors:

• Place a piece of the carton or soft cloth against the 

side panel of the refrigerator to pad and protect the 
stainless steel finish.

• Place the refrigerator on the handtruck 

with a side

against the truck only

.

• Move the refrigerator indoors.

REINSTALL DOORS

Refer to the illustration on page 5 or 6.
• Carefully, route the water line tubing and electrical

through the freezer side bottom hinge. Lower the door
onto bottom hinge.

• Secure top hinge. 
• Insert the tubing all the way into the coupler.
• Reconnect the wiring harness.
• Replace top cap with original screws and springs 

(where present).

Follow the same procedure to reinstall the fresh food door.

STEP 2   INSTALL WATER LINE

• A cold water supply is required for automatic icemaker

operation. The water pressure must be between 40 and
120 p.s.i.

• Route GE SmartConnect

Refrigerator Tubing or 1/4" OD

copper tubing between house cold water line and the
water connection location.

• Measure the distance from the water valve on the back

of the refrigerator to the water supply line. Add 8 foot
length to allow the refrigerator to be moved away from
the wall after installation. Bend the tubing into 3 coils of
about 10".

NOTE: The only GE approved plastic tubing is supplied 
in GE SmartConnect

Refrigerator Tubing kits. Do not

use any other plastic water supply line because the line
is under pressure at all times. Certain types of plastic
will crack or rupture with age and cause water damage
to your home.

GE SmartConnect

Refrigerator Tubing Kits are 

available in the following lengths:

2' (0.6 m)

– WX08X10002

6' (1.8 m)

– WX08X10006

15' (4.6 m)

– WX08X10015

25' (7.6 m)

– WX08X10025

Shut off the main water supply.

Turn on the nearest faucet long enough to clear the line 
of water.
• Install a shut-off valve between the icemaker water 

valve and cold water pipe in a basement or cabinet. 
The shut-off valve should be located where it will be 
easily accessible.

• Turn on the main water supply and flush debris. 

Run about a quart of water through the tubing into a
bucket. Shut off water supply at the shut-off valve.

NOTE: 

Saddle type shut-off valves are included in many

water supply kits, but are not recommended for this 
application.

Summary of Contents for ZFSB23DSS

Page 1: ...Installation Instructions Free Standing Side by Side Stainless Steel Refrigerator ZFSB23D SS ZFSB25D SS monogram com ...

Page 2: ...ons for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to Installer Be sure to leave these instructions with the Consumer Note to Consumer Keep these instructions with your Owner s Manual for future reference WARNING This appliance must be properly grounded See Grounding the Refrigerator page 4 AVERTISSEMENT Cet appareil doit être correctement mis à la terre Consul...

Page 3: ...HE INSTALLATION SPACE The opening width must be at least 36 1 4 Water And Electrical Locations The opening must be prepared with the electrical and water supply located as shown Additional Specifications A 115 volt 60Hz 15 or 20 amp power supply is required An individual properly grounded branch circuit or circuit breaker is recommended Install a properly grounded 3 prong electrical receptacle rec...

Page 4: ...place under the refrigerator where you are working GROUNDING THE REFRIGERATOR IMPORTANT Please read carefully FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED The power cord of this appliance is equipped with a 3 prong grounding plug which mates with a standard 3 prong grounding wall receptacle to minimize the possibility of electric shock hazard from this appliance Have the wall outle...

Page 5: ...is best to remove one door at a time A Remove 2 screws on top and 2 screws at the back of the top cap Lift off top cap B Open both doors Remove the 2 toekick screws and pull forward to remove C Disconnect the water line coupler by pushing against the collar on the left side Disconnect wire harness D Remove 2 screws holding top hinge to the case Carefully lift off door Follow the same procedure to ...

Page 6: ...ne door at a time A Remove 2 screws and springs on top of the refrigerator one on each side Push the top cap forward and lift up from the rear B Remove 2 screws holding the top filler strip lift off C Open both doors Remove the 2 toekick screws and pull forward to remove D Disconnect the water line coupler by pushing against the collar on the left side Disconnect wire harness E Remove 2 screws hol...

Page 7: ...D copper tubing between house cold water line and the water connection location Measure the distance from the water valve on the back of the refrigerator to the water supply line Add 8 foot length to allow the refrigerator to be moved away from the wall after installation Bend the tubing into 3 coils of about 10 NOTE The only GE approved plastic tubing is supplied in GE SmartConnect Refrigerator T...

Page 8: ...r supply Insert the end of the copper tubing into the refrigerator connection at the back of the refrigerator as far as possible Hold the tubing in place and tighten the fitting If you are using GE SmartConnect tubing Insert the molded end of the tubing into the refrigerator connection at the back of the refrigerator and tighten the compression nut until it is hand tight Then tighten one additiona...

Page 9: ...n the screw to the right to raise the door turn left to lower the door NOTE A nylon plug is imbedded in the threads of the pin The plug is designed to prevent the pin from turning A wrench must be used to turn the pin Turn the wrench one or two times Open and close the refrigerator door to check alignment with the freezer door at the top Adjust again if necessary Use a 3 8 hex socket or wrench to ...

Page 10: ...the path of the feeler arm Discard the first full bucket of ice cubes To turn the icemaker off set the switch to OFF STEP 10 TEMPERATURE CONTROLS The temperature controls are preset at 37 F for the refrigerator and 0 F for the freezer Allow 24 hours to stabilize before making adjustments STEP 11 INSTALL TOEKICK Press toekick into position and reinstall one screw on each side IMPORTANT The vented t...

Page 11: ...11 Notes ...

Page 12: ...ur area call 1 800 444 1845 NOTE Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 31 46518 Part No 225D1974P002 02 08 JR Printed in Mexico GE Consumer Industrial Appliances General Electric Company Louisville KY 40225 ge com ...

Reviews: