7
Installation Preparation
Stainless Steel Interior Dishwashers
Hot Water
Supply
• Turn off the water supply.
• Cut a hole approximately 1-1/2" dia. within
the shaded area to admit the water line.
Access holes must be round and smooth.
• Install a hand shut-off valve in the hot water
supply line in an accessible location, such as
under the sink. (The shut-off valve is op-
tional, but recommended and may be
required in some local codes.)
• Install the hot water inlet line, using no less
than 3/8" O.D. copper tubing or 1/2" O.D.
plastic tubing.
• The water line must be long enough to form
a smooth natural loop with no sharp bends
or kinks between the cutout entry and fill
valve location. For a left side entry, allow
approximately 30" length. For a right side
entry, allow approximately 40" length.
• Extend the water line forward to approxi-
mate fill valve location.
• Adjust the water heater to deliver 120
°
F min.
water temperature.
• The water pressure of the hot water supply
line must be 20 to 120 psi.
The hot water supply
line may enter from
either side, the rear
or from the floor
within the shaded
area.
6"
1-1/2" Dia.
Hole
1-3/4"
2" from Floor
Cabinet Face
Hot
Shut-off
Valve
Left
Side Entry
Approx. 30"
from Wall
Right Side Entry
Approx. 40" from Wall