The GE 24-in. washer is designed to allow certain
models of the GE 24-in. dryer to be placed on top
(stacking). Dryer models that currently qualify for
stacking are:
DCVH480EK
•
DCVH485EK
•
PCVH480EK
•
PCVH485EK
•
Note: If you are planning to stack the washer and
dryer, order Stacking Kit number GE24STACK to be
used for this dryer. Kit sold separately.
IMPORTANT –
•
Save these instructions for local
electrical inspector’s use.
IMPORTANT –
•
Observe all governing codes and
ordinances.
Note to Installer –
•
Be sure to leave these
instructions with the Consumer.
Stacking installations may require a power cord
•
up to six feet in length.
WARNING!
• Make sure the dryer is unplugged.
• More than 2 people are recommended to safely
lift the dryer into position.
• Avoid damage to the existing utility services.
DO NOT
•
place the washer on top of the dryer.
Location Requirements
When installed in a location other than an alcove
or closet, the minimal clearances to combustible
surfaces and for air opening are: 0 inches on both
sides, and 3 inches front and rear. Consideration
must be given to provide adequate clearance for
installation and service.
Note: If your dryer is approved for installation in an
alcove or a closet, it will be stated on a label on the
back.
When installed in an alcove or closet:
The dryer MUST be vented to the outdoors.
•
Minimum clearance between dryer cabinet
•
and adjacent walls or other surfaces is 0 inches
either side, and 3 inches front and rear.
Minimum vertical space from fl oor to overhead
•
shelves, cabinets, ceilings, etc., is 67.7 inches.
Closet doors must be louvered or otherwise
•
ventilated and have at least 60 square inches
of open area equally distributed. If the closet
contains both a washer and a dryer, doors must
contain a minimum of 120 square inches of
open area equally distributed.
Note: WHEN THE EXHAUST DUCT IS LOCATED AT THE
REAR OF THE DRYER, MINIMUM CLEARANCE FROM
THE WALL IS 5.5 INCHES.
Stacking Instructions