40
GE Oil & Gas
ValVue SVI II AP Quick Start
CAUTION
The SVI II AP High Flow digital valve positioner cannot be
placed in parallel with another volume booster. Contact the
factory for further instructions regarding configuration with
boosters as well as other non-standard configurations.
Connecting the Air Supply
After the tubing is installed, use the following procedure to connect the air supply.
1. Supply clean, dry compressed air to the filter regulator.
2. Turn on the air supply.
3. Adjust the filter regulator.
Supply pressure must be 5 - 10 psi greater than the spring range of the
actuator but may not exceed the rated actuator pressure. Refer to the valve or
actuator instruction manual.
Summary of Contents for SVI II AP-2
Page 6: ...GE Oil Gas SVI II AP Quick Start Guide 6 ...
Page 10: ...10 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 64: ...64 GE Oil Gas ValVue SVI II AP Quick Start This page intentionally left blank ...
Page 90: ...90 GE Oil Gas ValVue SVI II AP Quick Start Spare Parts ...
Page 91: ...91 Specifications and Spare Parts ...