background image

Parts Included

Installation Instructions

for your new

Before you begin - Read these instructions completely and carefully.

IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. 

Note to Installer – Be sure to leave these instructions with the Consumer. 

Note to Consumer – Keep these instructions with your Owner’s Manual for future reference

.

RAVTRANS

Transition Plenum

   31-30824-2      06-17 GEA

GE is a trademark of the General Electric Company. Manufactured under trademark license.

 

Installation  

Overview 

(Small Chassis Shown)

Existing

Architectural 

Louver

Exterior/ 

Outside Wall

Existing

Wall Plenum

Unit

RAVWP6 

– 6” D x 19-3/4” W x 32” H

RAVWP8 

– 8” D x 19-3/4” W x 32” H

RAVWP12 

– 12” D x 19-3/4” W x 32” H

RAVWP15 

– 15” D x 19-3/4” W x 32” H

RAVTRANS Kit will fit the following GE Appliances plenum kits:  RAVWP6, RAVWP8, RAVWP12 and RAVWP15. 

RAVTRANS kit is required when replacing an AZ75/AZ85 series vertical air conditioner with a new AZ90/91 

series vertical air conditioner.  Differences in chassis designs between the AZ75/AZ85 series and AZ90/91 

series require careful installation planning.  Changes in drain exit locations and drain routing, electrical 

connections, platform height, conditioned air duct location and additional space requirements for installation of 

RAVTRANS kit are all items that need to be considered when replacing a AZ75/AZ85 series unit with an AZ90/91 

series unit.

Installation of a new AZ90/91 series unit with a transition plenum will take up approximately 2-1/2” of additional 

closet space once the unit is fully installed. Before starting the conversion be sure there is adequate closet 

space to meet the manufacture’s recommend minimum clearance requirements.

Transitional 

Wall Plenum

Insulation

Drain Pan

Flange

Mounting 

screw 

locations

Unit Side

Transition Plenum

6 - #8 3/4” hex head sheet metal screws

4 - Pieces of Insulation 

1 - Drain Pan

Transition

Wall Plenum

Existing Wall 

Plenum Side

(2) Top and Bottom 

Pieces of Insulation

(2) Side Pieces 

of Insulation

Drain Pan

Summary of Contents for RAVWP6

Page 1: ...ir conditioner with a new AZ90 91 series vertical air conditioner Differences in chassis designs between the AZ75 AZ85 series and AZ90 91 series require careful installation planning Changes in drain exit locations and drain routing electrical connections platform height conditioned air duct location and additional space requirements for installation of RAVTRANS kit are all items that need to be c...

Page 2: ...rea should look like this STEP 2 Install and Connect the Transition Plenum to the Existing Wall Plenum NOTE The Drain pan must be installed into the transition plenum prior to screwing the transition plenum to the existing wall plenum 1 Before mounting the transitional plenum install a piece of precut insulation to the bottom of the transitional plenum Insulation should be installed flush with the...

Page 3: ...ition plenum the sealing gasket should be lubricated with soapy water or similar solution to reduce the friction between the side of the unit and the gasket 2 Refer to the installation instructions that came with the unit to complete the installation Platform height varies by chassis size see below for details Printed in the United States Inside Wall Rigid Ductwork Platform Surface Platform Surfac...

Page 4: ...ans la conception de la carrosserie entre les séries AZ75 AZ85 et la série AZ90 91 exige une planification minutieuse de l installation Des modifications dans les sorties et la trajectoire du drainage les connexions électriques la hauteur de plateforme l emplacement des conduits d air et les dégagements supplémentaires requis pour l installation de la trousse RAVTRANS sont tous des éléments dont i...

Page 5: ...accès ou porte de l armoire Plenum mural existant Une fois terminée la zone de l armoire devrait ressembler à ceci ÉTAPE 2 Installation et raccordement du plenum de transition au plenum mural existant REMARQUE Le plateau de drainage doit être installé dans le plenum de transition avant de visser ce dernier dans le plenum mural existant 1 Avant de monter le plenum de transition posez une pièce d is...

Page 6: ...être lubrifié avec de l eau savonneuse ou une solution similaire afin de réduire la friction entre le côté de l appareil et le joint 2 Reportez vous aux instructions d installation incluses avec l appareil pour compléter l installation La hauteur de la plate forme varie selon la taille du châssis voir ci dessous pour plus de détails Imprimé aux États Unis 1 1 2 po Petite plate forme de plate forme...

Reviews: