GE PD900 Installation Instructions Manual Download Page 3

3

(Continued on following page)

Door removal is not a requirement for 

installation of the product, but is an added 

convenience. To remove the door:

Open the oven door as far as it will go.

Push both hinge  

locks down toward  

the door frame,  

to the unlocked  

position. This may  

require a flat blade  

screwdriver.

NOTE: The oven door is very heavy.   

Be sure you have a firm grip before lifting the 

oven door off the hinges. Use caution once the 

door is removed. Do not lay the door on its 

handle. This could cause dents or scratches.

Installation Instructions

Pre-Installation Checklist

Hinge Lock

(Unlocked 

Position)

Hinge

Slot

Hinge Arm

Place hands on both sides of  

the door, and close the oven  

door to the removal position.  

This is half way between the  

broil stop and fully closed.

Lift door up and  

out until the  

hinge arms  

clear the slots.

DO NOT LIFT THE DOOR  

BY THE HANDLE!

Inspect Installation Location

Protect the kitchen floor!

 Flatten and place 

a piece of the shipping carton in front of the 

installation location to protect the flooring.

Move Range Indoors In Front of 
Cabinet Opening 

(Do not use hand trucks when moving 

the unpackaged range. Cooktop glass 

may be broken.)

To obtain Kits: 

a. Visit GE Web Site  (See page 1)

b. Call GE Answer Center (See page 1)

c. Contact Dealer

Do not remove the protective channel 

from the sides of the glass cooktop until 

later in installation.  

(If supplied) 

Inspect cutout dimensions and location  

of electrical junction box to be sure it fits 

within the layout location. See page 4.

Refer to alternate construction section for 

the following non-standard installations.

a.  Counter opening extends to the wall:

 

Maintop Filler Kit (JXS66XX), or

 

Backguard Kit (JXS36XX or JXS39SS). 

 

WARNING: 

If you do not use these 

kits, the anti-tip bracket must fit under 

an attachment to the wall that can 

withstand a force of 200lbs. in the 

upward direction. See Section D1.

b.  Island Installation:

 

To provide an optimum installation, the 

top surface of the countertop must be 

level and flat (lie on the same plane) 

around the 3 sides that are adjacent to 

range cooktop. Proper adjustments to 

make the top flat should be made or 

gaps between the countertop and range 

cooktop may occur. Forcing the cooktop 

to fit may cause excessive gaps, or could 

break the glass cooktop and void the 

warranty.

Remove packing materials. Remove labels 

on door, plastic on trims and  

panel, and all tape around the range.

Hinge 

Clears Slot

Summary of Contents for PD900

Page 1: ...ON INSTALLER All electric drop in ranges must be hard wired direct wired into an approved junction box A plug and receptacle is NOT permitted on these products If you have questions call 1 800 GE CARE...

Page 2: ...onal Electrical Code ANSI NFPA No 70 Latest Edition You can get a copy by writing National Fire Protection Association Batterymarch Park Quincy MA 02269 Effective January 1 1996 the National Electrica...

Page 3: ...when moving the unpackaged range Cooktop glass may be broken To obtain Kits a Visit GE Web Site See page 1 b Call GE Answer Center See page 1 c Contact Dealer Do not remove the protective channel from...

Page 4: ...Required Clearances A If cabinets are placed less than 30 min above the range see alternate construction 30 ranges conform to U L requirements for 0 spacing from vertical walls below countertops Allo...

Page 5: ...ge and voiding the warranty Center the 30 wide opening over the ad jacent cabinets and mark with a straight edge Using a straight edge mark the back line at 23 3 16 from the front edge of the counter...

Page 6: ...ED FROM THE LEADS NO CONDUCTOR SHALL BE EXPOSED IN THE CONNECTION THE EXCEPTION TO THE CONDUCTOR BEING EXPOSED IS THE BARE COPPER GROUND CONNECTION Position the range in front of the opening but sligh...

Page 7: ...l codes do not permit grounding through neutral Cut the neutral white lead from the crimp Re strip the neutral white lead to expose the proper length of conductor and connect it to the white or gray b...

Page 8: ...clamp of the proper size is obtained NOTE TO ELECTRICIAN The 3 power leads supplied with this appliance are UL recognized for connection to larger gauge household wiring The insulation of these 3 lead...

Page 9: ...n D1 Continued on following page 1 For 3 4 Counter 2 For 1 18 3 cm Counter 3 For 1 5 Counter 4 For 3 5 5 Alternate shown below anti tip installation alternate anti tip installation Interior Wall 1 4 M...

Page 10: ...nge into place carefully setting the side metal flanges under the glass on the edges of the countertop opening The protective channels must be in place if supplied during this operation D3 Countertop...

Page 11: ...the Stop Screw It is suggested that two people lift the range and carefully slide it towards the back of the opening When the range is approximately 1 from the back of the opening lift the front of t...

Page 12: ...uctionscont D NOTE The oven door is heavy You may need help lifting the door high enough to slide it into the hinge slots Do not lift the door by the handle D8 D9 Bottom Edge of Slot Hinge Arm Hinge N...

Page 13: ...diately Recheck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended th...

Page 14: ...countertop front and the control panel ends See page10 D3 AA Island Installation When installing in an island or other non standard location countertop cutout dimensions must be according to page 5 Fo...

Page 15: ...15 NOTES...

Page 16: ...16 NOTES 31 10622 3 02 10 GE...

Reviews: