10
Installation Instructions
(Continued on following page)
Standard Installation Instructions
cont.
D
Carefully mark the cabinet for the
location of the stop screws. Drill 1/8”
pilot holes into the cabinet, each side of
the range. (Make sure not to drill entirely
through the cabinet wall.) Carefully turn
the shoulder screws into the pilot holes
until they are tight.
Install Stop Screw
These screws prevent the range from
sliding out of position during operation.
Placing the Range into the
Opening (Continued)
D2
D3
Placing the Range into the
Opening
It is suggested that two people lift the
range into place, carefully setting the
side metal flanges under the glass on
the edges of the countertop opening.
The protective channels must be in
place (if supplied) during this operation.
D3
Countertop
Cabinet
Range
Lift and Slide Range
on Countertop
Countertop
Gap Approx. 4”
Gap Approx. 4”
Remove the Protective Channels
(if provided)
Carefully remove the protective channels
from the sides of the glass cooktop. This
may require a slight lifting of the range to
remove the weight of the range from the
protective channels.
D4
Remove Protective Cover From
Both Sides After Range Is In Cabinet
Protective Cover
Glass Cooktop
Carefully slide the range toward the back of the
opening. Stop pushing the Range when there
is still a 4” gap at the front before flushing the
Range with the countertop.
Summary of Contents for PD900
Page 15: ...15 NOTES...
Page 16: ...16 NOTES 31 10622 3 02 10 GE...