Chapter 2: Installation, Maintenance, and Checkout
Installation and Service Checkout Procedures
2-2
Service Manual
2.1.2.3 Service tools
Note:
The resuscitation systems service tools are described in the Resuscitation Systems service manual.
Note:
A straight-line laser level (with two wall leveling capability) or a combination of T-square and Plumb-
bob is recommended for accurate heater alignment of Freestanding and Wall Mount Warmer
models.
2.2 Installation and Service Checkout Procedures
Except for Panda Wall Mount Warmer model, all other warmer models do not require any installation. After
removing the warmer unit from the shipping package, perform the following checkout procedures before
putting the unit into use.
For Panda Wall Mount Warmer model, refer to the installation instructions in
to mount and
secure the unit on the wall and do heater alignment. Then perform the following checkout procedures
before putting the unit into use.
2.2.1 Mechanical Checks
1.
Disconnect the power cord for the mechanical portion of the preoperational checkout procedure.
2.
Examine the power cord for any signs of damage. Replace the cord if damage is evident.
3.
Check that the cord retainer/accessory outlet guard on the back of the control panel is in place.
4.
Examine the unit overall for any damaged or missing parts.
5.
Examine the unit for any missing or damaged labels. Make sure the labels are attached in the proper
locations. For a list of labels and their proper locations, refer to
.
Heater dish alignment laser kit (includes holder) (takes
three #392 1.55V button cells or equivalent)
M1118361
Laser holder (includes O-ring)
M1118362
NULL Modem Cable
M1128795
Light gray touch-up paint (Munsell .16GY8.56-0.44
chroma), 18 ml
6600-0714-200
Masimo SET 1 electrical leakage test cable
2006036-001
Masimo SET 2 electrical leakage test cable
M1230051
Nellcor electrical leakage test cable
M1237129
Crank handle kit
M1163421
Warning:
Use only the specific power cord supplied with the unit. Use of an
unapproved power cord could result in damage to the unit or injury.
Warning:
Do not perform the preoperational checkout procedure while the patient
occupies the unit.
Warning:
Complete the preoperational checkout procedure section of this manual
before putting the unit into operation. If the equipment fails any portion of the
checkout procedure it must be removed from use and repaired.
Summary of Contents for PANDA
Page 4: ...RH 2 Service Manual...
Page 12: ...ii Service Manual About this Manual User Responsibility...
Page 38: ...Chapter 1 Functional Description System Functions 1 14 Service Manual FIGURE 1 8 Power Failure...
Page 60: ...Chapter 2 Installation Maintenance and Checkout Scale Checkout Procedures 2 8 Service Manual...
Page 62: ...Chapter 3 Calibration Scale Calibration Bedded Models Only 3 2 Service Manual...
Page 172: ...Chapter 6 Illustrated Parts Wiring Diagrams 6 40 Service Manual...
Page 180: ...Appendix A Specifications SpO2 Specifications A 8 Service Manual...