Standard Installation Preparation
PREPARE THE OPENING (cont.)
Installation under a Microwave Oven and
over a Warming Drawer:
NOTE:
Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
PREPARE THE OPENING (cont.)
Installation over another Built-In
SpeedCook Oven:
• If you are mounting a Built-In SpeedCook Oven
over another, use the dimensions shown. The
middle rail separating the two openings may
need to be larger than the 2
Ǝ
minimum shown.
30
Ǝ
23-1/2
Ǝ
25-1/4
Ǝ
17-1/2
Ǝ
2
Ǝ
Min.
(3
Ǝ
Recommended)
17-1/2
Ǝ
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
30
Ǝ
23-1/2
Ǝ
25-1/4
Ǝ
17-1/2
Ǝ
2
Ǝ
Min.
(3
Ǝ
Recommended)
Per Microwave
Oven Requirement
3.5
Ǝ
Min.
(4.5
Ǝ
Recommended)
Per Warming
Drawer
Requirement
Construct
solid bottom - Min.
3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
IMPORTANT:
Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.