GE
Direction 5370626-100, Revision 16 LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
3-4
Section 3-2 - Receiving and Unpacking the Equipment
Section 3-2
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
1.) Cut the four PLASTIC BANDs.
2.) Cut the adhesive tape and open top covers of paper carton.
Figure 3-1 Open top covers of paper carton.
Adhesive tape
Plastic Bands
1
2
Summary of Contents for LOGIQ e R4 Series
Page 271: ......