![GE Innova 2100-IQ Preinstallation Manual Download Page 80](http://html1.mh-extra.com/html/ge/innova-2100-iq/innova-2100-iq_preinstallation-manual_4332925080.webp)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
1.8 Layout Constraints
The X-Ray tube Chiller elevation cannot exceed 3 meters (9.84 feet) in height.
Minimum distance between Digital Detector and UPS is 3 m (118 inches) (Fluoro
UPS option).
The distance of the Detector chiller cannot exceed 3 m (1 floor) in height below
the detector.
80
1 Room Layout Considerations
Summary of Contents for Innova 2100-IQ
Page 219: ......