![GE Innova 2100-IQ Preinstallation Manual Download Page 45](http://html1.mh-extra.com/html/ge/innova-2100-iq/innova-2100-iq_preinstallation-manual_4332925045.webp)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
Chapter 3 Physical Requirements of Room
1 Presentation of the 3 Rooms
1.1 Examination room
•
Innova LC Positioner
•
Omega Patient Table
•
Performix X–Ray Tube Assembly
•
Collimator
•
Innova Digital Detector
THE ELECTRONIC CABINETS (C1, C2, COOLIX 4000 CHILLER, DETECTOR
CONDITIONER AND FLUORO UPS WHEN INSTALLED) INCLUDE FANS THAT ARE
CREATING AIR–CIRCULATION OF PULSED–AIR. WHEN THIS PULSED AIR IS
IN AN ENVIRONMENT THAT MAY CONTAIN AIRBORNE PATHOGENS LIKE AN
EXAM ROOM/CONTROL ROOM, THERE IS A RISK OF TRANSMISSION OF THESE
AIRBORNE PATHOGENS FROM PATIENTS TO OTHER PATIENTS OR CLINICAL
PERSONNEL (NOSOCOMIAL DISEASES).
TO REDUCE THIS RISK, THE ELECTRONIC CABINETS MUST BE INSTALLED IN A
ROOM SEPARATED FROM EXAM ROOM/CONTROL ROOM, I.E., TECHNICAL ROOM.
1.2 Technical room
•
C2 Cabinet
•
C1 Cabinet
•
Coolix 4000 Chiller
•
Detector Conditioner HEAT DRY 1
•
Fluoro UPS (option) (1 Cabinet)
•
Fluoro UPS IF box (option)
1.3 Control room
•
VCIM
•
DL Flat Panel
•
DL Keyboard
•
Monitors
Chapter 3 Physical Requirements of Room
45
Summary of Contents for Innova 2100-IQ
Page 219: ......