GE Healthcare
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQCardiovascular Imaging SystemPre-Installation Manual
OPERATING DOCUMENTATION
5314528-2-1ENRevision 1
Page 1: ...GE Healthcare Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual OPERATING DOCUMENTATION 5314528 2 1EN Revision 1...
Page 2: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2...
Page 3: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information LANGUAGE Important Information 3...
Page 4: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 4 Important Information...
Page 5: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 5...
Page 6: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 6 Important Information...
Page 7: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 7...
Page 8: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 8 Important Information...
Page 9: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 9...
Page 10: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 10 Important Information...
Page 11: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 11...
Page 12: ...nova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 12 Important Informatio...
Page 13: ...al GE Healthcare Direction 5314528 2 1EN Revision 1 Revision History Part Rev Date Reason for Change Pages 5314528 1 1EN rev 1 30 July 2008 Initial release 302 5314528 2 1EN rev 1 December 19 2008 Ini...
Page 14: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 14 Revision History...
Page 15: ...va 3100 3100 IQ and 4100 4100 IQ Case 27 1 3 Description of the X Ray generator 27 1 4 Description of the X Ray head 28 1 5 Description of the Innova Imaging System 28 1 6 Description of the image mon...
Page 16: ...Support Suspension 42 3 7 System Compatibilities Cross Reference 21 53 CM 17 43 CM 18 19 Monitors 43 4 Optional Innova System Components 44 4 1 System Compatibilities Cross Reference Omega Table Sub S...
Page 17: ...dows and curtains 57 3 Structural Requirements 58 3 1 Room Size 58 3 2 Door Size Requirements 58 3 2 1 Door Height 58 3 2 2 Door Width 58 3 3 Floor 58 3 3 1 General Vascular GEMS Policy 58 3 3 2 Floor...
Page 18: ...t Constraints 80 2 Room Layout Drawings 81 2 1 Room layout and room min length 82 2 2 Room Layout for Innova System example 1 2 Suspension rails parallel to table 84 2 3 Room Layout for Innova System...
Page 19: ...Injector Mounting Requirements 147 CHAPTER 6 ELECTRICAL CONNECTIONS 149 1 Power Distribution 149 2 Recommended Power Distribution System 152 2 1 Main functions 152 2 2 Typical PDB Europe CE 153 2 3 Ty...
Page 20: ...ts 181 16 Physical Runs 184 16 1 Physical Run Synoptic 184 16 2 System Core Matrix 185 16 3 PHYSICAL RUN SYSTEM CORE DETAIL 192 17 PIST0021 US Fluoro UPS and PDB connection 195 17 3 1 Connection of th...
Page 21: ...ion 1 2 Tools and Test Equipment 208 3 Route Survey 210 3 1 Step One Sketch 210 3 2 Step Two Survey 210 3 3 Step Three Check 210 4 European Process Order Select 212 5 Pre Installation Checklist 213 CH...
Page 22: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 22 Table of Contents...
Page 23: ...es references to the pre installation documents of the various product included with an Innova System These documents are intended to assist the Installation Specialist and the Site Planner in properl...
Page 24: ...ies as appropriate Tool and Test Equipment Chapter 7 Section 2 Tools and Test Equipment Pre Installation Checklist Chapter 7 Section 5 Pre Installation Checklist Contract Changes Be sure to inform the...
Page 25: ...M LAYOUTS ELECTRICAL CONNECTIONS and ADDITIONAL PLANNING AIDS of this manual They represent an important part of the pre installation process The checklists summarize the required preparations and all...
Page 26: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 26 3 Pre Installation Pro...
Page 27: ...allation 1 2 Description of the Innova Patient table 1 2 1 Innova 2100 IQ Case Innova 2100 IQ System can be supplied with an OMEGA IV Compact patient table an OMEGA V long patient table which includes...
Page 28: ...DU and the Jedi generator C2 cabinet positioner control Fluoro UPS interface box near C1 cabinet Fluoro UPS option VCIM console Revolution Digital Detector mounted on Innova LC positioner An external...
Page 29: ...ver Emitter 2 DL color LCD monitor 19 3 Keyboard 4 Mouse 5 Keypads for user dialogue 6 Video station Hi Brite monitor in a user area VCR in option 1 8 AW workstation 2 monitors 19 flat panel and 1 mon...
Page 30: ...loor and elevator loading capacity Check the integrity of the UPS equipment carefully If you notice visible damage do not install or start the UPS Contact the nearest Service Center immediately WARNIN...
Page 31: ...ifferential breaker is placed on the hospital main supply upstream the PDB the differential shall be set to 300 mA Switching OFF the unit does not isolate the UPS from the utility Do not install the U...
Page 32: ...ents for IntraVascular UltraSound imaging designed as add on equipment to Vascular Imaging systems The IVUS s5i GE equipment is also capable of recieving patient data from the Innova system The Volcan...
Page 33: ...duct Illustration 2 2 Innova LC positioner including L arm Item 1 Pivot Item 2 C arc Item 3 Motorized elevator Item 4 for the Revolution Digital Detector X ray tube Item 5 Siemens collimator Item 6 21...
Page 34: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 2 C1 Cabinet Illustration 2 3 2 3 C2 Cabinet Illustration 2 4 34 2 Innova P...
Page 35: ...Q 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 4 Omega Patient Table Illustration 2 5 2 5 Tilt Patient Table Illustration 2 6 C...
Page 36: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 6 User Interface Illustration 2 7 36 2 Innova Product Identif...
Page 37: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 7 Fluoro UPS Illustration 2 8 NOTE Refer to the UPS vendor Service manual Installation Guide SG Serie 10 20 30 40 kVA for mo...
Page 38: ...100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 9 X Ray Tube Chiller Illustration 2 10 2 10 Digital Detector Chillers Illustration 2 11...
Page 39: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 11 Innova User Area Illustration 2 12 Chapter 2 Innova Syste...
Page 40: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 12 IVUS Option Illustration 2 13 40 2 Innova Product Identifi...
Page 41: ...s Sub System PRODUCT NAME MODEL NUMBER PRE INSTALLATION DOCUMENT NUMBER NOTES TILT TABLE 2354463 This document OMEGA IV TABLE 2320221 3 This document Includes tabletop OMEGA V LONG TABLE 2320045 5 Thi...
Page 42: ...59035 This document Innova 4100 41 cm Revolution Digital detector 2329766 This document Detector Chiller Thermo Tek with Innova 2100 IQ 2387548 This document Detector Chiller Thermo Con with Innova 31...
Page 43: ...6 m 5126896 2378538 or 2378540 2393190 100 3 7 System Compatibilities Cross Reference 21 53 CM 17 43 CM 18 19 Monitors PRODUCT NAME MODEL NUMBER PRE INSTALLATION DOCUMENT NUMBER CATALOG NUMBER 17 43 c...
Page 44: ...ATALOG NUMBER SMART HANDLE 2237456 3 5127605 This document SMART BOX 2237457 3 5127604 This document TSSC SP W CF 2347973 5127602 This document Note 1 w CF means with Contour Filter and w o CF means w...
Page 45: ...ARE CREATING AIR CIRCULATION OF PULSED AIR WHEN THIS PULSED AIR IS IN AN ENVIRONMENT THAT MAY CONTAIN AIRBORNE PATHOGENS LIKE AN EXAM ROOM CONTROL ROOM THERE IS A RISK OF TRANSMISSION OF THESE AIRBORN...
Page 46: ...west temperature e g 10 C 50 F and humidity is preferable If they are to be stored outside of their shipping box or in the inner shipping box without plastic wrapping they should be stored at 20 C 68...
Page 47: ...PORT MIN MAX MIN MAX MIN MAX MIN MAX Examination room 0 3000 30 3000 70 106 70 106 Technical room See Notice below 0 3000 30 3000 70 106 50 106 Control room 0 3000 0 3000 N A N A N A N A The chiller i...
Page 48: ...Room Main disconnect panel PDB 0 4 1534 0 45 1534 0 45 1534 0 45 1534 Total for core system 4 6 15762 7 0 24020 8 9 30324 11 7 39881 Room Options 3 5 Stand by Moderate Use 4 Typical Use 4 Maximum Use...
Page 49: ...ing to Standard IEC 62040 1 2 Do not put anything on the top of the cabinet If the UPS is placed on a raised floor the airflow for UPS cooling should enter from underneath the UPS through the appropri...
Page 50: ...TOR IS RESPONSIBLE FOR PROVIDING AND CONNECTING THE CABLES FROM THE PDB TO THE UPS AND CONFIGURING THE PDB IN BYPASS MODE GEHC IS RESPONSIBLE FOR POWERING ON THE SYSTEM WITH THE UPS IN BYPASS MODE GED...
Page 51: ...nfection refer to operator manual Chapter Safety and Regulatory section Disinfection recommended disinfecting agents Degree of safety of application in the presence of a flammable anesthetic mixture w...
Page 52: ...ny interference in nearby electronic equipment Harmonic emissions IEC 61000 3 2 Not applicable The Innova system is suitable for use only in establishments not directly connected to a public low volta...
Page 53: ...ns on power supply input lines IEC 61000 4 11 0 Un for 5 sec 0 Un for 5 sec Mains power quality is that of a typical commercial and or hospital environment If the user of the Innova system requires co...
Page 54: ...is fully operational 3 V m 800 MHz to 2 5 GHz E3 0 3 V m At that disturbance amplitude the monitor image might present some slight flicker For image quality improvement the monitor might be removed fr...
Page 55: ...here P is the power rating of the transmitter in watts W according to the transmitter manufacturer NOTE These are guidelines Actual conditions may vary 2 4 4 Limitations Management Adhering to the dis...
Page 56: ...m have to be all AC power supplied by the same power distribution panel line NOTE In order to avoid interferences the same AC power distribution panel should supply all components accessories the Inno...
Page 57: ...se on radiation protection in x ray rooms 2 6 Audible noise Less than 50 dB A at 1 meter for an Innova LC Positioner Limited to 50 dB A at 1 meter for Omega IV Omega V and Tilt tables Limited to 55 dB...
Page 58: ...e protective side rail removed on site NOTE Door widths are based on a straight in approach requiring a 2 44 m 96 in wide corridor Calculations need to be made for accommodation of equipment through n...
Page 59: ...or requirements when using provided floor anchors The maximum pullout force per provided anchor was calculated assuming A concrete compression strength of 17 24 MPa at 28 days which is the minimum req...
Page 60: ...8 2 1EN Revision 1 NOTE For specific floor preparation procedures refer to PIM Innova 2000 2100 IQ 3100 4100 Cardiovascular Imaging System Pre Installation Kit Installation Procedures Illustration 3 4...
Page 61: ...r Mounting Template contained in Chapter 5 Section 2 Mounting Requirements 3 3 4 Hole dimension and preferred location in concrete floor In the examination room the Innova LC Positioner is not placed...
Page 62: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 6 Hole location in concrete floor 62 3 Structural Re...
Page 63: ...but the height of the outcoming conduit plus bushing is limited to 1 2 in 12 7 mm NOTE Refer to table Chemical anchors Pull out efforts and recommendations in Chapter 5 Section 2 Mounting Requirement...
Page 64: ...GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 7 Water Conduit location In some countries depending on local regulations it may be forbidden to run electrical cables and water pipes i...
Page 65: ...00 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 8 Water Conduit location Illustration 3 9 Cable Curvature Chapter 3 Phy...
Page 66: ...hored to the floor See Chapter 2 Section 3 Basic Innova LC System Compatibility for referential documents C1 C2 Cabinets Wall support 2285242 Every sub system is delivered on site with its proper seis...
Page 67: ...lab Securing a supplementary channel to the bottom of the vertical members and mounting the stationary rails to this channel can greatly reduce the number of vertical members The stationary rail suppo...
Page 68: ...ation 3 11 SPECIFICATIONS FOR A TYPICAL 17 10 5 44 M INBOARD STATIONARY RAIL MOUNTING INTERFACE BOTH RAILS CEILING MOUNTED Table 3 12 Stationary rail in different length Rail length mm ft A C D INBOAR...
Page 69: ...on 5314528 2 1EN Revision 1 3 4 4 Boom Mounted for Monitor Suspension One type of boom mounted is supplied as counterpoised monitor suspension not adjusted on site as follows for 2 x 21 53 cm EIZO Gmb...
Page 70: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 12 Recommended locations for 3 monitor suspension A recommended location for 3 monitor suspension is defined to...
Page 71: ...5 Walls 3 5 1 General requirement The C1 Cabinet the C2 Cabinet and the PDB Cabinet must be securely fastened to the wall to prevent them from tipping 3 5 2 Seismic Areas NOTE For Fluoro UPS option US...
Page 72: ...3 4 wires 3 ph GND Table 3 14 ELECTRICAL REQUIREMENTS System line voltage with Fluoro UPS UL Peak Max Power input kVA Frequency Hz Mains Voltage V Max Line Impedance ohms Peak Current A Average Curren...
Page 73: ...iller at 380 VAC 50 Hz With a main power supply at 360 VAC 60 Hz use an autotransformer to supply the Chiller at 480 VAC 60 Hz For PDU C1 Cabinet the voltage range is 380 VAC 10 to 20 PDU setting 342...
Page 74: ...which provide a type 3 5 mm Jack plug for connecting external audio device 4 3 Room Lighting See Illustration Room Lighting for Innova System in Chapter 4 Section 2 Room Layout Drawings for a recomme...
Page 75: ...patient on table during an examination the operator can require a help with a Surgical Imaging mobile unit to finish the examination In this case a wall outlet single phase ground is required to feed...
Page 76: ...inside the C1 cabinet A dedicated phone line with a local socket used only for a connection to a modem will preferably be located close to the cabinet The phone outlet must be located less than 1 met...
Page 77: ...room e g wall device be greater than 50 cm 19 7 in or 65 mm 25 6 in if the Header Extender is used taking into account the fact that the Tilt table can rotate 180 Provide sufficient space around the p...
Page 78: ...ency Stop from accidental actuation 1 6 Patient Environment Equipment The components that may be installed within patient vicinity need to be medical equipment patient vicinity is defined in the stand...
Page 79: ...System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 7 Preference Cabinet locations Illustration 4 1 The service area dimensions shown above are just an example Service ar...
Page 80: ...2 1EN Revision 1 1 8 Layout Constraints The X Ray tube Chiller elevation cannot exceed 3 meters 9 84 feet in height Minimum distance between Digital Detector and UPS is 3 m 118 inches Fluoro UPS opti...
Page 81: ...THOGENS FROM PATIENTS TO OTHER PATIENTS OR CLINICAL PERSONNEL NOSOCOMIAL DISEASES TO REDUCE THIS RISK THE ELECTRONIC CABINETS MUST BE INSTALLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECH...
Page 82: ...ht Recommended 32 ft 0 in 9 75m 20 ft 0 in 6 00 m 10 ft 0 in 3 05 m Minimum For minimum exam room lengths see different table configurations in Illustration 4 2 Illustration 4 3 and Illustration 4 4 1...
Page 83: ...n Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 4 3 Omega V or Tilt Table Angio Cardio Neuro without header extender requirement 500 mm Illustration 4 4 Omega IV or Tilt Table w...
Page 84: ...ing System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 2 Room Layout for Innova System example 1 2 Suspension rails parallel to table Illustration 4 5 Example 1 suspensi...
Page 85: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 4 6 Example 2 suspension rails either side of patient table Chap...
Page 86: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 5 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...
Page 87: ...allation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 3 Room Layout for Innova System example 3 Illustration 4 7 Example 3 suspension perpendicular to patient table Monitor suspension sho...
Page 88: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 7 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...
Page 89: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 4 Room Layout for Innova System example 4 Illustration 4 8 Example 4 suspension perpendicular t...
Page 90: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 8 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...
Page 91: ...4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 5 Room Lighting for Innova System Illustration 4 9 Room Lighting for Innova Syste...
Page 92: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 9 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...
Page 93: ...ardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 6 Room Layout for Innova System example with Mobile system 9800 Illustration 4 10 Room Layout fo...
Page 94: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 10 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube ho...
Page 95: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 3 IVUS Option 3 1 Functional Diagram Illustration 4 11 Chapter 4 Roo...
Page 96: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 96 3 IVUS Option...
Page 97: ...t Table Interference Regions Illustration 5 8 Tilt Patient Table Interference Regions Illustration 5 9 Omega Table side clearence CPR access Illustration 5 10 Innova LC Positioner and Omega IV Compact...
Page 98: ...ardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 1 Innova LC Positioner Dimensions Side View Illustration 5 2 Innova LC Positioner D...
Page 99: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 3 Innova LC Positioner Dimensions Top view Chapter 5 Physical...
Page 100: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 4 Omega IV Compact Patient Table Dimensions 100 1 Dimen...
Page 101: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 5 Omega V Long Patient Table Dimensions Chapter 5 Physical C...
Page 102: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 6 Tilt Patient Table Dimensions 102 1 Dimension D...
Page 103: ...n Manual GE Healthcare Direction 5314528 2 1EN Revision 1 NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dimensions of the medical Gas Bo...
Page 104: ...Q 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 7 Omega IV Compact Patient Table Interference Regions Innova 2100 I...
Page 105: ...IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 8 Omega V Long Patient Table Interference Regions Chapter 5 Physi...
Page 106: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 9 Tilt Patient Table Interference Regions 106 1 Dimens...
Page 107: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 10 Omega Table side clearence CPR access Chapter 5 Physical...
Page 108: ...rdiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 11 Innova LC Positioner and Omega IV Compact Patient Table Relative Positions Innova...
Page 109: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 12 Innova LC Positioner and Omega V Long Patient Table Relative Positions side vie...
Page 110: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 13 C2 Cabinet Dimensions 110 1 Dimension Draw...
Page 111: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 14 C1 Cabinet Dimensions Chapter 5 Physical Characte...
Page 112: ...llustration 5 15 Floor Space Diagram for Lytron Chiller The maximum elevation difference between X Ray Tube Housing and Chiller is around 3 meters 10 ft Exact dimensions of the Coolix 4000 chiller dep...
Page 113: ...r Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 16 Detector Chiller Thermo Tek Dimensions The chiller cannot be located more than 3 m 10 ft bel...
Page 114: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 17 Detector Chiller Thermo Con Dimensions 114 1 Dimens...
Page 115: ...4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 18 Detector Chiller Thermo Tek Configuration Orientation Chapter 5 P...
Page 116: ...UL Layout Optional The left right or back side of the UPS cabinet can be positioned against the wall The front side of the UPS cabinet must be accessible for maintenance operation Clearance around the...
Page 117: ...lation and to make easier the maintenance operations for UPS and battery we recommend a minimum distance of 200 mm 8 from the wall The right side of the UPS cabinet must be accessible for maintenance...
Page 118: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 22 UPS IF Box Optional 118 1 Dimension Drawi...
Page 119: ...e Direction 5314528 2 1EN Revision 1 Illustration 5 23 Gas box outlets Omega IV NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dimensions...
Page 120: ...althcare Direction 5314528 2 1EN Revision 1 Illustration 5 24 Gas box outlets Omega V NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dime...
Page 121: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 25 DL Keypad Dimensions Chapter 5 Physical Character...
Page 122: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 26 DL Image Monitor Dimensions 122 1 Dimension D...
Page 123: ...GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 27 VCR Mounting Holes Location NOTE Unscrew the four feet on the bottom Use these four holes to fix the VCR The mounting holes accommoda...
Page 124: ...ega V 571 5x429 22 5x16 9 2410 kg m2 492 3 lb ft2 Table 900 1983 See note 1 Tilt 750x600 30x24 2000 kg m2 409 lb ft2 Same as Innova LC Positioner See IMPORTANT NOTICE below IMPORTANT NOTICE The Table...
Page 125: ...2 4 4 38 96 177 Control Station 4 8 8 120 360 240 Joystick 1 2 2 90 76 102 Isolation transformer 7 15 4 97 267 171 IVUS CPU 15 33 1 396 162 510 IVUS Keyb mouse pad 1 2 2 NA NA NA IVUS monitor 15 33 1...
Page 126: ...able 5 3 cont d Title Illustration Inner Base Plate For Above Grade Floor Anchor Kit Illustration 5 31 Innova LC Positioner And Tilt Table Floor Mounting Template Illustration 5 33 and Holes location...
Page 127: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 28 Chapter 5 Physical Characteristics 127...
Page 128: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 29 128 2 Mounting Requirements...
Page 129: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 30 Chapter 5 Physical Characteristics 129...
Page 130: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 31 130 2 Mounting Requirements...
Page 131: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 32 Chapter 5 Physical Characteristics 131...
Page 132: ...ides the recommended chemical anchors for Omega LC baseplates and for the floor plate ordered locally that they could be used instead of bolts provided by GE Table 5 4 Chemical anchors Pull out effort...
Page 133: ...e baseplate Omega Table Omega Floor plate to be ordered locally Minimum floor thickness 180 mm 7 in 220 mm 8 1 2 in 220 mm 8 1 2 in 180 mm 7 in Max Tightening Torque 80 N m 59 ft lb 150 N m 110 ft lb...
Page 134: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 33 Gantry and table mounting holes 134 2 Mounting Re...
Page 135: ...istance ANGIO CARDIO CARDIO NEURO Omega IV Compact NA 1395 mm 54 9 in Omega V Long 1278 mm 50 3 in 1395 mm 54 9 in Omega V non motorized Long 1278 mm 50 3 in 1395 mm 54 9 in Tilt Table 1278 mm 50 3 in...
Page 136: ...are mandatory to install the table patient support The Table must never be installed on grade The Omega Tilt Table baseplate is recommended if a future Omega to Tilt table upgrade is to be considered...
Page 137: ...althcare Direction 5314528 2 1EN Revision 1 Floor plate Base plate Assembly 2285632 Templates select kit 2285054 Refer to Section 2 4 Angio Cardio Neuro templates 2285056 containing 2185979 2127792 an...
Page 138: ...ar Gantry Baseplate and Table 1 pc Doc 2229297 100 LCA LCV LC System Baseplate and Omega IV V EP Table Floor Preparation 1 pc Doc 2290880 2 100 Innova Pre Installation Kit Install Procedure 1 pc NOTE...
Page 139: ...Dowel 2290937 2 Wood Dowel 16 mm diameter 6 pc Bolt Hex 2296892 Through bolt M20 500 400 6 pc Washer Flat 99142204 Washer plain 21 mm 40 mm for Through Bolts one for each bolt 6 pc Plate 2290941 Speci...
Page 140: ...ame Part Description Quan Notes Floor Anchor 46 302265P1 Floor Anchor Bolt 5 8 10x6 16 mm drilling 16 mm drilling 12 anchors for LC Positioner and 4 anchors for Table 16 pc Above Grade anchor mounting...
Page 141: ...thod hardware Washer Flat 99142204 Special Flat Washer for Through Bolts one for each bolt 16 pc same as above Plate 2290941 Special Steel Spacer Plate 4 in x 4 in 102 mm x 102 mm one for each bolt 16...
Page 142: ...ositioner and 4 anchors for Table 16 pc On Grade anchor mounting method hardware Grout assy 2285055 10 kg Powdered Mortar Ardex K 15 RTV Silicon Rubber Adhesive 18 mm making tape adhesive Open cell fo...
Page 143: ...or LC Positioner and 4 anchors for Table 16 pc Above Grade anchor mounting method hardware Grout assy 2285055 10 kg Powdered Mortar Ardex K 15 RTV Silicon Rubber Adhesive 18 mm making tape adhesive Op...
Page 144: ...ach bolt 16 pc same as above Plate 2290941 Special Steel Spacer Plate 4 in x 4 in 102 mm x 102 mm one for each bolt 16 pc same as above Nut Hex 99141607 Hex Nut M20 STL galvanized two for each bolt 32...
Page 145: ...ex Screws 2360523 Screw M16x30x30 Inox A4 80 Pass 12 pc For floor plate Base plate assembly Washer 99125091 Washer P 17 mm 40 mm 34 pc 24 are used for the positioner integration Hex Screws 99133570 Sc...
Page 146: ...Notes 2185979 LC Positioner and Omega C N Patient Table floor mounting template 1 pc See Illustration 5 33 2127792 LCV Gantry and Omega A Patient Table floor mounting template 1 pc A C N Templates 23...
Page 147: ...exceeding 5 kg 11 lbs at 100 mm 0 33 ft i e IV pole with its accessories pressure head is authorized on the same table accessory rail as the injector Never install injector and radiation protection o...
Page 148: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 148 2 Mounting Requireme...
Page 149: ...1EN Revision 1 Chapter 6 Electrical Connections 1 Power Distribution Illustration 6 1 AC Interconnect without Fluoro UPS NOTE All short AC power cable less than 3 meters between peripherals and respec...
Page 150: ...UPS see table below and configuring the PDB in bypass mode 2 GEHC is responsible for powering on the system with the UPS in bypass mode 3 GEDE is responsible for UPS commissioning Table 6 1 A and B ca...
Page 151: ...1EN Revision 1 NOTE The PDB shall include the switch allowing the commutation of generator supply to the UPS Neutral shall be fed by the hospital The customer provides the cables A and B NOTE Refer to...
Page 152: ...V 60 Hz is certified to UL 508 and CSA C22 2 N 14 North America Second configuration 380 400 415 V 50 60 Hz is certified to EN 60439 1 and is CE marked not certified for Japan and China Please check...
Page 153: ...ystem Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 It is recommended to separate the two power supply cables from the other cables 2 2 Typical PDB Europe CE Typical PDB Eur...
Page 154: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 3 CE PDB 1 2 154 2 Recommended Power Distribution...
Page 155: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 4 CE PDB 2 2 Chapter 6 Electrical Connections...
Page 156: ...100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 5 System Power Block Diagram 156 2 Recommended Power Dist...
Page 157: ...100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 6 Detail Of General Power Supply C1 Power Terminal Connection Chapter...
Page 158: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 3 Typical US PDB Illustration 6 7 PDB UL layout 1 2 158 2 Recommended Power...
Page 159: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 8 PDB UL layout 2 2 Chapter 6 Electrical Connecti...
Page 160: ...0 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 9 PDB UL Electrical Schematic 1 2 160 2 Recommended Power D...
Page 161: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 10 PDB UL Electrical Schematic 2 2 Chapter 6 Electrical...
Page 162: ...configuration only The EMI filter box shall be installed on the sites with fluoro UPS CE The EMI Filter Box will be delivered as a single product not part of Fluoro UPS or PDB by GE Consumer Industri...
Page 163: ...nding system is recommended for meeting patient safety requirements Reference For general system grounding requirements and information on establishing an equipotential grounding system refer to Groun...
Page 164: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 12 Grounding Interconnect Without Fluoro UPS 164 3...
Page 165: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 13 Grounding Interconnect With Fluoro UPS Chapter 6 Electric...
Page 166: ...ements for power supply cables provided by the customer The customer shall provide the power supply cables between the main transformer and the system between the transformer and the PDB Power Distrib...
Page 167: ...hall be kept separated from room system cables Power supply and ground cables must be connected to the same distribution panel They must run near one to the other Power supply and ground cables provid...
Page 168: ...on 5 1 Wiring Diagram The connection cables between the IVUS Control Room and Procedures Room components run in a dedicated under floor conduit see Section 5 2 A GND wire between the C1 cabinet and th...
Page 169: ...able in the Procedures Room Locate the Procedures Room exit of the conduit close to the centerline of the Patient Table Locate it as close to the Patient Table base as possible considering Room for ac...
Page 170: ...d 1 IVUS Joystick 806380001 ECG cable in case if NON Mac Lab ECG will be installed NOTE For the ground cable see the IVUS service manual for special instructions concerning cable running and cutting N...
Page 171: ...ues See table below Line Voltage Fuse value 100 VAC 8 A 120 VAC 6 3 A 230 VAC 3 15 A Frequency 50 60 Hertz The country specific power cords are pre selectable in the GTC The IVUS will be connected to...
Page 172: ...ve by low voltage relay 24 V In the Exam Room visible from any place in the room Acting during X ray exposures room light limited to 24 Vac maxi wires sized to 10 Amps maxi controls an external relay...
Page 173: ...Q 3100 3100 IQ and 4100 4100 IQ has the ability to control an external relay that applies power to the room light dry contacts The relay is to be provided by the hospital or contractor The wire size t...
Page 174: ...vided by the control room control panel The speaker must be installed in the exam room out of the patient vicinity to give easy access to the FE for maintenance operations and to medical staff to adju...
Page 175: ...erlocks It is the responsibility of the field service to check that this requirement is not in contradiction with local regulation In case of conflict follow local regulation No other measures employe...
Page 176: ...ply the system in record mode Such an UPS will provide to the customer about 10 minutes of autonomy Contact your local GEMS representative for more information and or public power distribution analysi...
Page 177: ...ad positioner cabinet but it is highly recommended to connect it to a wall outlet fed by the main disconnect room device 11 2 Pedestal Injector A power cord is supplied with the injector In all cases...
Page 178: ...power cord is supplied with Advantage Windows It is connected to outlet fed by the main disconnect room device Verify that the ground between AW AW spliter and monitors ground are equipotential 0 1 oh...
Page 179: ...al GE Healthcare Direction 5314528 2 1EN Revision 1 13 MAC LAB System EX The best location for a MAC LAB Acquisition Unit Floor mount kit 408431 001 isn t defined yet For MAC LAB System EX refer to Ma...
Page 180: ...terconnect maps and connection details refer to the following Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ MIS Map Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ MIS Charts General Guidelines Innova System intr...
Page 181: ...of additional cables being added later as the system is developed and options are added The use of conduit is recommended for cables running overhead between rooms especially when a diagonal run prov...
Page 182: ...mounting bracket Floor mount installation can be accomplished one of two ways Connectors mounted in trough under mounting bracket Figure 1 Connectors mounted above mounting bracket Figure 2 Illustrat...
Page 183: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 18 Cable Channeling Layout Chapter 6 Electrical Conn...
Page 184: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 16 Physical Runs 16 1 Physical Run Synoptic Illustration 6 19 184 16...
Page 185: ...to connector when you look at the cable level For a description of how to use the following cable group schematics see below Illustration 6 20 Cable length data is as follows Cable Length the total c...
Page 186: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 21 Cable Group 1 From Technical Area To Exam Room 186 16...
Page 187: ...IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 22 Cable Group 2 From Technical Area to Control Room Chapter 6 El...
Page 188: ...00 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 23 Cable Group 3 From Technical Area to Technical Area C1 To C2...
Page 189: ...5314528 2 1EN Revision 1 Illustration 6 24 Cable Group 4 Suspension are always pre cabled with 24 meter cables of connector to connector Monitor options includes their 24 meters length for cabling Ext...
Page 190: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 25 Cable Group 4 with LCD Suspension 190 16 Physi...
Page 191: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 26 UPS Option Cable Set Chapter 6 Electrical Connec...
Page 192: ...513A 2250247 2464 300 7 CEI 320 HBL4570C plug 38 6 27514A 5139188 2789 30 7 3 DB 26 pin 41 2 27675A 2361531 Type CL2 150 8 2 Pre stripping 8 2 27567A 2337165 2464 300 9 9 DB 15 pin 41 9 27660A 2258294...
Page 193: ...00 8 1 DB 9 pin 34 4 27687A 2264834 1354 30 6 BNC 75 ohms 14 4 27688A 2264834 1354 30 6 BNC 75 ohms 14 4 27689A 2264834 1354 30 6 BNC 75 ohms 14 4 27690A 2264834 1354 30 6 BNC 75 ohms 14 4 27691A 2264...
Page 194: ...5191 7 30V VGA 28048 2385192 7 30V VGA 28049 2385191 6 30V VGA 28050 2385192 6 30V VGA 28066 2385193 7 1354 30V BNC 14 4 28067 2385194 7 1354 30V BNC 14 4 28068 2385193 8 1354 30V BNC 14 4 28069 23851...
Page 195: ...Engineer s toolkit 1 17 2 2 Required Conditions Condition Reference Effectivity The PDB is already installed Power cables are as follows 1 From PDB to UPS rectifier input 4x6 AWG recommended 4x3 AWG...
Page 196: ...e provided to monitor voltages less than 85 loss of a phase or incorrect phase sequence Corrections to the phase sequence must be corrected only at the line side of the main circuit breaker CB1 1 Conn...
Page 197: ...aging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 29 17 3 2 Connection of the Fluoro UPS Option Cables 1 Connect the Fluoro UPS power cables a Remove...
Page 198: ...on 6 30 b Remove the protection panel Illustration 6 30 c Remove the metallic window from the protection panel Illustration 6 30 d The power cable shall enter the UPS by the bottom right hand side ent...
Page 199: ...ustration 6 31 iii Drill a hole in the bottom cover plate for cable access RISK OF ELECTRIC SHOCK HIGH VOLTAGE PRESENT THE FLUORO UPS REQUIRES COMMON POWER INPUT FOR RECTIFIER AND BYPASS JUMPERS SHALL...
Page 200: ...l Rectifier input phase 3 to X1 L3 1 terminal Rectifier ground to X1 PE rectifier terminal g Connect the Fluoro UPS output cable from PDB power block 2 as follows Illustration 6 32 Output load 1 to X1...
Page 201: ...9 4 349 On pallet See Illustration 7 3 Omega Table Base Assembly 49 1 24 38 0 96 84 2 2 14 1 290 585 On pallet See Illustration 7 4 Omega Table Top Assembly 9 0 22 137 3 47 33 0 84 155 70 On pallet Se...
Page 202: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 Detail Of Innova Shipping Information 1 2 1 Innova LC Positioner Gantry On Shipping Dolly Ill...
Page 203: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 2 Innova LC Positioner Air Shipment Illustration 7 2 Chapter 7 Additiona...
Page 204: ...100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 3 Innova C1 and C2 Cabinet on pallet Illustration 7 3 The shipping weight is of about...
Page 205: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 4 Omega Shipment Illustration 7 4 Chapter 7 Additional Plannin...
Page 206: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 5 Omega Using Positioner Dollies Illustration 7 5 206 1 Shipping...
Page 207: ...allation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 6 Tilt Table Shipment Illustration 7 6 1 2 7 Other Elements Package NOTE All OEM parts are shipped inside there original boxes grou...
Page 208: ...Wrench Spanner 46 176584P1 High Voltage Cable Installation Innova LC Positioner Laptop Computer MS DOS Windows Positioner Configura tion and Calibration Status Display Same as for Innova LC Service En...
Page 209: ...ion Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Table 7 2 cont d PRODUCT OR COMPONENT TOOL OR TEST EQUIPMENT USED FOR SOURCE RECEIVED DATE Monitor Suspension Phillips Flathead screwdriver...
Page 210: ...n circles refer to Route Survey data The Route Survey is a form on which site data are listed see Section 3 2 Illustration 7 8 3 2 Step Two Survey Data concerning the intended delivery route are recor...
Page 211: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Table 7 3 Ref no Area loading dock doorway hallway turn elevator obstruction etc Limitations loading capacity height width dep...
Page 212: ...omponents like cables stationary rails etc are length selectable This selection should reflect the particularities encountered by an Installation Specialist on Site All cable and component selections...
Page 213: ...ts may be red lined if red lining is allowed by local code Seismic requirements are identified on construction drawings X 2 Delivery route to installation or storage area meets requirements and has be...
Page 214: ...tallation areas X 9 Mechanical supplier has been provided with a set of equipment installation drawings for reference For California permitted construction drawings or PMI specified installation drawi...
Page 215: ...lect X Ray modality When prompted select the option for obtaining an IP address GEMSE Use the new mail form called INSFORM xls or INSFORM txt for obtaining an IP Address If you have questions or need...
Page 216: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 216 1 IP Addressing Proc...
Page 217: ...untry agency Seismic calculations per California Building Code applicable to the product can be found at the following address http gehcseismic com docs index cardiac_vascular htm Please contact your...
Page 218: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 218 1 Server Access...
Page 219: ......
Page 220: ...2008 General Electric Company GE Medical Systems a General Electric Company going to market as GE Healthcare 283 rue de la Mini re 78530 Buc FRANCE www gehealthcare com...