g
GE
OPM_SGS_ISG_M22_M30_0US_V011.doc
25/38
Installation
Guide
SG Series
225 & 300 kVA
3.8.3 Power connection separate input utility
S
G
S
_2
2
5-
30
0
_U
P
S c
o
n
ne
ct
ion
separ
ate_
GE_01US
PE Load
PE
Input rectifier
Position of the PE compression lugs in case
the cable input is from the bottom of the UPS
Input rectifier
PE
PE Load
L1-2
L2-2
L3-2
2
- I
N
PU
T
BY
PAS
S
1 -
IN
PU
T
RE
CT
IF
IE
R
N
L3-1
L2-1
L1-1
L3
L2
L1
LO
AD
N
Fig. 3.8.3-1 Power connections Separate Input Utility
Separate Input Rectifier / Bypass
L1-1
Rectifier Phase A
L1-2
Bypass Phase A
L2-1
Rectifier Phase B
L2-2
Bypass Phase B
L3-1
Rectifier Phase C
L3-2
Bypass Phase C
N
Neutral (Bypass)
PE
Ground
The interconnection links
BR1
,
BR2
and
BR3
must be removed (see
Fig. 3.8.3-2
).
Output Load
L1
Load Phase A
L2
Load Phase B
L3
Load Phase C
N
Neutral
PE
Ground
Bus bars
BR1
,
BR2
and
BR3
must be removed
.
Cable terminations are to the
Rectifier/Bypass Input Lugs
and
Load Output Lugs
as shown above.
Connect wire to the
Lugs
using appropriate tools and appropriate torque.
Torque specification for
Input/Output
and
DC
power connections on
Bus Bars
:
Section 3.8.1
.