OPM_SGS_ISG_M22_M30_0US_V011.doc
27/38
Installation
Guide
SG Series
225 & 300 kVA
3.8.4 Battery
connection
Q1
Q2
4
3
2
1
2
3
4
1
BATTERY
PE
_
+
SG
S
_
225
-30
0_
UPS
co
nne
cti
on
ba
tter
y_
01US
Fig. 3.8.4-1 Power connections Battery
Battery
+
Positive pole of the Battery
–
Negative pole of the Battery
Do not insert the
Battery Fuses
before the commissioning.
Battery Cable Terminations
are to the
Positive
and
Negative Terminals
as shown above.
Connect wire to the
Lugs
using appropriate tools and appropriate torque.
Torque specification for
Input/Output
and
DC
power connections on
Bus Bars
:
See section 3.8.1
.