11
User Manual V1.0-2022-05-10
05 Installation
5 Installation
5�1 Installation Requirements
1. Do not install the equipment in a place near flammable, explosive, or corrosive materials.
2. Install the equipment on a surface that is solid enough to bear the inverter weight.
3. Install the equipment in a well-ventilated place to ensure good dissipation. Also, the
installation space should be large enough for operations.
4. The equipment with a high ingress protection rating can be installed indoors or outdoors. The
temperature and humidity at the installation site should be within the appropriate range. (60
°C for outdoor unconditioned with solar effects.)
5. Install the equipment in a sheltered place to avoid direct sunlight, rain, and snow. Build a
sunshade if it is needed.
6. Do not install the equipment in a place that is easy to touch, especially within children’s
reach. High temperature exists when the equipment is working. Do not touch the surface to
avoid burning.
7. Install the equipment at a height that is convenient for operation and maintenance, electrical
connections, and checking indicators and labels.
8. Install the equipment away from electromagnetic interference.
Installation Environment Requirements