Installation Instructions
SEALING OF JOINTS
$OOMRLQWVVKRXOGEHWLJKWWRDYRLGOHDNV7KHPDOHHQGRI
HDFKVHFWLRQRIGXFWPXVWSRLQWDZD\IURPWKHGU\HU
7KHGXFWVKDOOQRWEHDVVHPEOHGZLWKVFUHZVRURWKHU
IDVWHQLQJPHDQVWKDWH[WHQGLQWRWKHGXFWDQGFDWFKOLQW
'XFWMRLQWVFDQEHPDGHDLUDQGPRLVWXUHWLJKWE\
ZUDSSLQJWKHRYHUODSSHGMRLQWVZLWKGXFWWDSH
+RUL]RQWDOUXQVVKRXOGVORSHGRZQWRZDUGWKHRXWGRRUV
LQFKSHUIRRW
INSULATION
'XFWZRUNWKDWUXQVWKURXJKDQXQKHDWHGDUHDRULV
QHDUDLUFRQGLWLRQLQJVKRXOGEHLQVXODWHGWRUHGXFH
FRQGHQVDWLRQDQGOLQWEXLOGXS
4
EXHAUST CONNECTION
THIS DRYER COMES READY FOR REAR
EXHAUSTING. IF SPACE IS LIMITED,
USE THE INSTRUCTIONS IN STEP 10 TO
EXHAUST DIRECTLY FROM THE SIDE OR
THE BOTTOM OF THE CABINET.
WARNING -
TO REDUCE THE RISK
OF FIRE OR PERSONAL INJURY:
7KLVFORWKHVGU\HUPXVWEHH[KDXVWHGWRWKHRXWGRRUV
8VHRQO\µULJLGPHWDOGXFWLQJIRUWKHKRPHH[KDXVW
GXFW
8VH RQO\ µ ULJLG PHWDO RU 8/OLVWHG ÀH[LEOH PHWDO
VHPLULJLGRUIRLOW\SHGXFWWRFRQQHFWWKHGU\HUWRWKH
KRPHH[KDXVWGXFW,WPXVWEHLQVWDOOHGLQDFFRUGDQFH
ZLWKWKHLQVWUXFWLRQVIRXQGLQ´&RQQHFWLQJWKH'U\HUWR
+RXVH9HQWµRQSDJHVRIWKLVPDQXDO
'R QRW WHUPLQDWH H[KDXVW LQ D FKLPQH\ D ZDOO D
FHLOLQJJDVYHQWFUDZOVSDFHDWWLFXQGHUDQHQFORVHG
ÀRRURULQDQ\RWKHUFRQFHDOHGVSDFHRIDEXLOGLQJ7KH
DFFXPXODWHGOLQWFRXOGFUHDWHDSRWHQWLDO¿UHKD]DUG
1HYHUWHUPLQDWHWKHH[KDXVWLQWRDFRPPRQGXFWZLWK
D NLWFKHQ H[KDXVW V\VWHP $ FRPELQDWLRQ RI JUHDVH
DQGOLQWFUHDWHVDSRWHQWLDO¿UHKD]DUG
'RQRWXVHGXFWORQJHUWKDQVSHFL¿HGLQWKHH[KDXVW
OHQJWK WDEOH /RQJHU GXFWV FDQ DFFXPXODWH OLQW
FUHDWLQJDSRWHQWLDO¿UHKD]DUG
1HYHULQVWDOODVFUHHQLQRURYHUWKHH[KDXVWGXFW7KLV
ZLOOFDXVHOLQWWRDFFXPXODWHFUHDWLQJDSRWHQWLDO¿UH
KD]DUG
'R QRW DVVHPEOH GXFWZRUN ZLWK DQ\ IDVWHQHUV WKDW
H[WHQGLQWRWKHGXFW7KHVHIDVWHQHUVFDQDFFXPXODWH
OLQWFUHDWLQJDSRWHQWLDO¿UHKD]DUG
'RQRWREVWUXFWLQFRPLQJRUH[KDXVWHGDLU
3URYLGHDQDFFHVVIRULQVSHFWLRQDQGFOHDQLQJRIWKH
H[KDXVWV\VWHPHVSHFLDOO\DWWXUQVDQGMRLQWV([KDXVW
V\VWHPVKDOOEHLQVSHFWHGDQGFOHDQHGDWOHDVWRQFHD
\HDU
.
CONNECTING THE DRYER TO HOUSE VENT
RIGID METAL TRANSITION DUCT
)RU EHVW GU\LQJ SHUIRUPDQFH D ULJLG PHWDO WUDQVLWLRQ
GXFWLVUHFRPPHQGHG
5LJLGPHWDOWUDQVLWLRQGXFWVUHGXFHWKHULVNRIFUXVKLQJ
DQGNLQNLQJ
UL-LISTED FLEXIBLE METAL (SEMI-RIGID) TRANSITION DUCT
,IULJLGPHWDOGXFWFDQQRWEHXVHGWKHQ8/OLVWHGÀH[LEOH
PHWDOVHPLULJLGGXFWLQJFDQEHXVHG.LW:;;
1HYHULQVWDOOÀH[LEOHPHWDOGXFWLQZDOOVFHLOLQJVÀRRUVRU
RWKHUHQFORVHGVSDFHV
7RWDOOHQJWKRIÀH[LEOHPHWDOGXFWVKRXOGQRWH[FHHG
IHHWP
NOTE: WE STRONGLY RECOMMEND SOLID METAL EXHAUST DUCTING.
HOWEVER, IF FLEXIBLE DUCTING IS USED IT MUST BE UL-LISTED METAL
NOT PLASTIC.
DUCT TAPE OR
DUCT CLAMP
4” METAL DUCT
(CUT TO PROPER
LENGTH)
DUCT TAPE OR
DUCT CLAMP
EXTERNAL
DUCT
OPENING
FOR STRAIGHT LINE INSTALLATION,
CONNECT THE DRYER EXHAUST TO
THE EXTERNAL EXHAUST HOOD
USING DUCT TAPE OR CLAMP.
STANDARD REAR EXHAUST
(Vented at floor level)
STANDARD REAR EXHAUST
(Vented at
À
oor level)
RECOMMENDED
CONFIGURATION
TO MINIMIZE
EXHAUST
BLOCKAGE.
ELBOW HIGHLY
RECOMMENDED
ELBOW HIGHLY
RECOMMENDED
STANDARD REAR EXHAUST
(Vented above floor level)
NOTE: ELBOWS WILL PREVENT DUCT
KINKING AND COLLAPSING.
STANDARD REAR EXHAUST
(Vented above
À
oor level)